Laserfiche WebLink
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 7 of 30 <br />Installation: <br /> <br />Concrete: <br />a) Placed after engineer approved reinforcement inspection <br />b) Minimum 7-day cure <br />c) Concrete mix shall be cast in place and conform to ACI 318-99 <br />Steel Deck <br />d) W- Beam and areas of work to install landing and platform shall have rust removal done in accordance <br />with SSPC-SP 1 and SSPC-SP 14 ( NACE 8) <br /> <br />e) All welds shown on plans shall be field welds. <br /> <br />Rebar and Welded Wire Mesh: <br />a) Reinforcing bars: <br />i) No field bending of bars will be allowed. <br />b) Placing reinforcing bars and Mesh: <br />i) Accurately place bars and adequately secure them in position. <br />ii) Contractor shall provide notice of a minimum of 72 hours for inspection. <br /> <br />Welding: <br />a) Must be completed by welders certified with AW-D1.1, AW-D1.3 OR CSA W47.1 <br />b) Clean and remove weld splatter after weld is completed. <br />c) Apply Cold galvanizing to weld area within 4 hours with a minimum of a 1 inch envelope <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28