Laserfiche WebLink
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 8 of 30 <br /> <br />Task 2 – Demolition and Installation of “Platform” <br />General: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and “Platform” <br />Materials: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and “Platform” <br />with the addition of the following. <br /> <br />Slide Anchorage: <br /> <br />a) New ¼” diameter x 2” long S.S. NAIL-IN ANCHORS RPL 2876 Rawl Plug or equivalent <br />Installation: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and <br />“Platform” with the addition of the following. <br /> <br /> <br />Utilities: <br /> <br />a) Turn off any utilities connected to water slide, (water, electrical for emergency stop, review during <br />inspection and refer to detail 9) <br />Shoring: <br /> <br />a) Slide sections and slide Entry box shall be supported and manipulated to prevent interference with <br />platform deck construction. Will require submittal of shop drawings. <br />Slide Anchorage: <br /> <br />a) Slide entry box and any manipulated features shall be reinstalled per details. <br /> <br /> <br />Task 3 – Stair Rehabilitation <br />General: <br /> <br />a) It is the contractor’s responsibility for scheduling and coordinating the Work of subcontractors, suppliers, <br />and other individuals or entities performing or furnishing any of contractor’s Work <br />b) Contractor is responsible for quality control to ensure that the work complies with the contract documents, <br />and said duty shall not be voided by any act or omission on the part of the inspector(s). <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28