My WebLink
|
Help
|
About
|
Sign Out
Home
Silman Industries NPSA 20231212
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Silman Industries NPSA 20231212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 2:39:25 PM
Creation date
12/26/2023 2:39:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/12/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231106
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 8 of 30 <br /> <br />Task 2 – Demolition and Installation of “Platform” <br />General: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and “Platform” <br />Materials: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and “Platform” <br />with the addition of the following. <br /> <br />Slide Anchorage: <br /> <br />a) New ¼” diameter x 2” long S.S. NAIL-IN ANCHORS RPL 2876 Rawl Plug or equivalent <br />Installation: See previous task labeled as “ Task 1 & Task 2 – Demolition and Installation of “Landing” and <br />“Platform” with the addition of the following. <br /> <br /> <br />Utilities: <br /> <br />a) Turn off any utilities connected to water slide, (water, electrical for emergency stop, review during <br />inspection and refer to detail 9) <br />Shoring: <br /> <br />a) Slide sections and slide Entry box shall be supported and manipulated to prevent interference with <br />platform deck construction. Will require submittal of shop drawings. <br />Slide Anchorage: <br /> <br />a) Slide entry box and any manipulated features shall be reinstalled per details. <br /> <br /> <br />Task 3 – Stair Rehabilitation <br />General: <br /> <br />a) It is the contractor’s responsibility for scheduling and coordinating the Work of subcontractors, suppliers, <br />and other individuals or entities performing or furnishing any of contractor’s Work <br />b) Contractor is responsible for quality control to ensure that the work complies with the contract documents, <br />and said duty shall not be voided by any act or omission on the part of the inspector(s). <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28
The URL can be used to link to this page
Your browser does not support the video tag.