Laserfiche WebLink
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 11 of 30 <br /> <br /> <br /> <br />Task 5 – Miscellaneous Repairs <br />General: <br /> <br />a) It is the contractor’s responsibility for scheduling and coordinating the Work of subcontractors, <br />suppliers, and other individuals or entities performing or furnishing any of contractor’s Work <br />b) Contractor is responsible for quality control to ensure that the work complies with the contract <br />documents, and said duty shall not be voided by any act or omission on the part of the <br />inspector(s). <br />Materials: <br /> <br />Lock: <br />a) D&D Technologies’ LLAA LokkLatch gate latch or equivalent <br />Screen/Mesh: See image of replacement section, material should adhere to the following: <br />a) ASTM 82 <br />b) Cold drawn steel <br />c) Galvanized <br /> Gate Hinge: <br />a) Gate Hinge at bottom of Tower shall have 5/8” diameter bolt reinstalled per Detail 7. <br />b) Bolt Shall be hot dip galvanized <br /> <br />Installation: <br /> <br />Lock: <br />a) Contractor shall field verify gate conditions, provide shop drawings, and furnish and install lock. <br />b) Refer to detail 8 for existing condition <br />Screen/Mesh: <br />a) Contractor shall replace existing screen with new material. Install per as-builts. <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28