My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-3 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 Mitigation Measure: Full MM(s) text <br />2 Monitoring/Reporting Action: Action to be taken by the environmental <br />3 monitor or Lead Agency <br />4 Effectiveness Criteria: How the agency can know if the MM is effective <br />5 Responsible Party: Entity responsible to comply with the MM <br />6 Timing: Before, during, or after terrestrial or marine Project construction; <br />7 during Project operation; etc. <br /> <br />8 1.4.1 AIR QUALITY <br /> <br />9 <br /> <br />10 MM AIR-1: Use of Tier 4 Equipment. All off-road diesel-powered heavy <br />11 equipment used to construct the Project shall be equipped with Tier 4 engines, <br />12 except for specialized equipment or when Tier 4 engines are not available. <br />13 Retrofits that achieve or exceed emission reductions equivalent to that of a <br />14 Tier 4 engine may be used in lieu of Tier 4 engines. <br /> <br />15 <br /> <br />16 MM AIR-2: Standard Control Measures for Construction Equipment. The following <br />17 air quality control measures shall be implemented during terrestrial construction. <br /> <br />18 Maintain all construction equipment in proper tune according to <br />19 manufacturer’s specifications. <br />20 Fuel all off-road and portable diesel-powered equipment with CARB- <br />21 certified motor vehicle diesel fuel (non-taxed version suitable for use <br />22 off-road). <br />23 All on- and off-road diesel equipment shall not idle for more than <br />24 5 minutes continuously. <br />25 Signs shall be posted in the designated queuing areas and job sites to <br />26 remind drivers and operators of the 5-minute idling limit. <br />27 Diesel idling within 1,000 feet of sensitive receptors is not permitted. <br />28 Staging and queuing areas shall not be located within 1,000 feet of <br />29 sensitive receptors. <br />30 Electrify equipment when feasible. <br />Potential Impact: Air Quality – Impacts from construction emissions <br />Potential Impact: Air Quality – Impacts from construction emissions <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30
The URL can be used to link to this page
Your browser does not support the video tag.