Laserfiche WebLink
City of San Leandro <br />Installation Agreement – Att A <br />Page 12 of 17 <br /> <br />• Installation of new electrical disconnect. <br />• Protective coil coatings on the new unit. <br />• Installation of economizer and MERV 13 filters as per manufacturer’s recommendations. <br />• Disconnection/reconnection of existing condensate drain line. <br />• Disconnection/reconnection to the existing BAS. <br />• Start-up/testing of the new unit. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br />• Roofing other than repairs required for new roof curb adapters. <br /> <br /> Replace one (1) ductless split system unit with a new high efficiency unit of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing unit per EPA guidelines. <br />• Proper disposal or containment of refrigerant. <br />• Installation of one (1) new split system unit with programmable thermostat. <br />• Disconnection/reconnection of the existing electrical service. <br />• Disconnection/reconnection of existing condensate drain line (installation of new <br />condensate pump as required). <br />• Start-up/testing of the new unit. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br /> <br />Lighting <br /> Retrofit existing interior T5 fluorescent, incandescent, and CF lighting systems with new high <br />efficiency LED lighting systems. Please see the Lighting Summary in Attachment B for detailed <br />information on lighting scope, quantities, and locations. <br /> <br /> Retrofit existing exterior building and pole-mounted CF and high-intensity discharge (HID) lighting <br />systems with new high efficiency LED lighting systems. Please see the Lighting Summary in <br />Attachment B for detailed information on lighting scope, quantities, and locations. <br /> <br />Marina Community Center <br />Lighting <br /> Retrofit existing interior T8 fluorescent and CF lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br /> <br />Public Safety <br />Controls <br /> Recommission the existing Johnson Controls BAS. <br /> <br /> <br /> <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8