My WebLink
|
Help
|
About
|
Sign Out
Home
Impec Group NPSA 20240401
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Impec Group NPSA 20240401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 4:23:05 PM
Creation date
3/22/2024 3:55:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/1/2024
Retention
PERM
Document Relationships
5B Consent
(Amended)
Path:
\City Clerk\City Council\Agenda Packets\2024\Packet 20240304
Reso 2024-017 Janitorial Services NPSA
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between April 1, 2024 <br />City of San Leandro and Impec Group—Exhibit D Page 18 of 36 <br />112 Extra Work <br />(a) The City may request extra work from the Contractor as needs arise. Contractor will only be <br />compensated for work which is approved in writing by the City in advance. The City reserves the <br />right to accomplish extra work with City forces or with other contractors instead of this Janitorial <br />Contractor. <br />(b) Upon notification that extra work will be required, the Contractor shall submit an itemized, written <br />cost proposal for such work to the City. The City shall retain the right to reject such co st proposal <br />and perform the extra work with City forces or other contractors. Should the proposal be acceptable <br />to the City, the Contractor shall be advised in writing and upon receipt of such written notification <br />shall begin the work within five (5) working days or as mutually agreed between the Contractor and <br />the City. <br />(c) The Contractor shall do such extra work in accordance with the agreement for extra work and with <br />the provisions of these specifications and shall furnish all labor, materials and equipment. Any extra <br />work shall be performed in a manner and time that does not negate the normal contracted work and <br />schedule. The City reserves the right to have other contractors perform extra work. <br />(d) Payment for extra work performed shall be as agreed to by the C ontractor and the City using the <br />Extra Work Unit pricing submitted by the Contractor during the RFP process. Mark up for <br />Compensation for material will be requested in the Extra Work Unit pricing. City may request that <br />Contractor provide invoice copies for material or employee timesheets for labor at the extra work <br />rate. <br />(e) The City may choose to have the contractor perform the extra work at the Hourly Rate for Extra <br />Work. <br />F. Facilities, Utilities, Supplies and Equipment <br />100 Facilities <br />1. The City shall provide, without cost to the Contractor, janitorial closets or a designated place in each <br />building. These areas shall be kept clean and neat by the Contractor at all times and shall only be <br />used for the intended use (i.e., eating may not occur nor storage of any food or personal items). <br /> <br />2. Supplies shall be stored in their proper place when they arrive. <br /> <br />3. Empty boxes, bottles, containers, etc. shall be properly discarded (including recycling, where <br />appropriate). Mop buckets shall be emptied and cleaned, and mops shall be washed out, before <br />storing in the designated janitorial space. Mop heads shall be replaced at a minimum of once a week <br />to prevent odors. <br />101 Utilities <br />1. The City shall furnish all utilities to the Contractor at existing outlets. Any modifications to existing <br />outlets for the Contractor’s convenience shall be at the Contractor’s expense. Prior written approval <br />for any alteration shall be obtained from the City’s Buildings Supervisor. The Contractor’s Project <br />Manager shall arrange for the work to be done and the costs shall be charged to the Contractor. <br />102 Telephones <br />1. The City telephone policy limits the use of its telephone extensions on the City system to calls relating <br />to City business. The Contractor shall ensure that employees observe this policy. The costs of <br />DocuSign Envelope ID: ED026586-45BF-457C-B317-CC6A9075C2DC
The URL can be used to link to this page
Your browser does not support the video tag.