Laserfiche WebLink
4. Mitigation Monitoring and Reporting Program <br /> <br />San Leandro Treatment Wetland <br />IS/MND <br />4-3 February 2024 <br /> <br />Implementation Procedure Monitoring and Reporting Actions Monitoring <br />Responsibility Monitoring Schedule <br />City shall contract with a <br />qualified biologist to <br />conduct pre-construction <br />surveys for salt marsh <br />wandering shrew. <br />City executes contract City, Qualified <br />biologist <br />Prior to construction <br />City and the appropriate <br />regulatory agency shall <br />establish relocation <br />protocols in a SSRP, if salt <br />marsh wandering shrew <br />are found. <br />City consults with agency City, regulatory <br />agency <br />Prior to construction <br />City shall include in its <br />contractor specifications <br />that fencing and <br />precautionary measures <br />buffer zones will be <br />avoided during <br />construction. <br />City reviews contractor bid <br />documents. <br />City Prior to construction <br />Contractor implements <br />measures in the program. <br />City documents that <br />measures are being <br />implemented <br />City’s <br />construction <br />manager <br />During construction <br />Mitigation Measure BIO-2: Avoid and Minimize Impacts to Roosting Bats <br />A qualified biologist shall conduct a pre-construction survey for roosting bats in all suitable bat <br />roosting habitat (large trees, concrete vault box) within the Project area within 14 days prior to the <br />beginning of project-related activities. If active bat roosts are discovered or if evidence of recent prior <br />occupation is established, a buffer shall be established around the roost site until the roost site is no <br />longer active. If an active bat roost needs to be removed as part of the Proposed Project, the Project <br />biologist would need to consult CDFW to determine appropriate methods for the removal of the roost. <br />As part of CDFW’s approval, a new roost site may need to be created on the Project site as mitigation. <br />Implementation Procedure Monitoring and Reporting Actions Monitoring <br />Responsibility Monitoring Schedule <br />City shall contract with a <br />qualified biologist to <br />conduct pre-construction <br />surveys for roosting bats. <br />City executes contract City, Qualified <br />biologist <br />Prior to construction <br />City and the appropriate <br />regulatory agency shall <br />establish buffer zones if <br />active roost sites are <br />observed. <br />City consults with agency City, regulatory <br />agency <br />Prior to construction <br />City shall include in its <br />contractor specifications <br />that buffer zones will be <br />avoided during <br />construction. <br />City reviews contractor bid <br />documents. <br />City Prior to construction