Laserfiche WebLink
Treatment Wetland Project Detailed Report, 2/14/2024 <br />64 / 85 <br />Sequest —————————————————— <br />Subtotal —————————————————— <br />Remove <br />d <br />—————————————————— <br />Subtotal —————————————————— <br />——————————————————— <br />Annual —————————————————— <br />Avoided —————————————————— <br />Subtotal —————————————————— <br />Sequest <br />ered <br />—————————————————— <br />Subtotal —————————————————— <br />Remove <br />d <br />—————————————————— <br />Subtotal —————————————————— <br />——————————————————— <br />5. Activity Data <br />5.1. Construction Schedule <br />Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description <br />Demo (Ph 1.2)Demolition 7/13/2024 7/19/2024 5.00 5.00 Clear and grub, demo <br />Initial Site Prep (PH 1.1)Site Preparation 7/1/2024 7/5/2024 5.00 5.00 Pond Prep, Pond <br />dewatering, Cement <br />stablize surface <br />Grading (Ph 1.3-1.5)Grading 7/20/2024 8/2/2024 5.00 10.0 Soil transfer and placement, <br />import, grading <br />Grading (Ph 3.3)Grading 8/17/2024 8/23/2024 5.00 5.00 bioreactors and cover, <br />topsoil placement