Laserfiche WebLink
Treatment Wetland Project Detailed Report, 2/14/2024 <br />65 / 85 <br />Building (Ph 2.1-2.2)Building Construction 7/20/2024 8/2/2024 5.00 10.0 Foundation install and <br />MABR mechanical and <br />electrical install <br />Building (Ph 3.1)Building Construction 8/3/2024 8/30/2024 5.00 20.0 Liner Install <br />Building ( Ph 3.4)Building Construction 8/24/2024 8/30/2024 5.00 5.00 Irrigation system install <br />Building (Ph 4.1)Building Construction 8/31/2024 9/6/2024 5.00 5.00 Retrofit outfall structure, <br />pipe connection, valving <br />Building (Ph 5.1)Building Construction 9/7/2024 9/20/2024 5.00 10.0 Planting <br />Trenching (Ph 3.2)Trenching 8/3/2024 8/16/2024 5.00 10.0 Piping installation <br />5.2. Off-Road Equipment <br />5.2.1. Unmitigated <br />Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor <br />Demo (Ph 1.2)Dumpers/Tenders Diesel Average 3.00 5.00 16.0 0.38 <br />Demo (Ph 1.2)Excavators Diesel Average 1.00 5.00 36.0 0.38 <br />Demo (Ph 1.2)Off-Highway Trucks Diesel Average 1.00 5.00 350 0.73 <br />Demo (Ph 1.2)Sweepers/Scrubbers Diesel Average 1.00 5.00 150 0.46 <br />Initial Site Prep (PH 1.1)Generator Sets Diesel Tier 4 Final 1.00 1.00 14.0 0.40 <br />Initial Site Prep (PH 1.1)Graders Diesel Average 3.00 5.00 140 0.37 <br />Initial Site Prep (PH 1.1)Surfacing Equipment Diesel Average 6.00 5.00 310 0.30 <br />Initial Site Prep (PH 1.1)Off-Highway Trucks Diesel Average 6.00 5.00 350 0.38 <br />Initial Site Prep (PH 1.1)Rollers Diesel Average 3.00 5.00 36.0 0.38 <br />Initial Site Prep (PH 1.1)Sweepers/Scrubbers Diesel Average 3.00 5.00 150 0.46 <br />Grading (Ph 1.3-1.5)Tractors/Loaders/Backh <br />oes <br />Diesel Average 1.00 5.00 84.0 0.41 <br />Grading (Ph 1.3-1.5)Rollers Diesel Average 2.00 5.00 36.0 0.37 <br />Grading (Ph 1.3-1.5)Skid Steer Loaders Diesel Average 1.00 5.00 71.0 0.40 <br />Grading (Ph 1.3-1.5)Rubber Tired Dozers Diesel Average 2.00 5.00 367 0.40