Laserfiche WebLink
3. Provide occupancy type for each space. <br />4. Provide occupant loads of each space. <br />5. Provide Building Type of Construction. <br />6. Verify that existing accessible parking and signage is compliant with 2019 <br />CBC. <br />7. Verify that existing accessible ramp is compliant with 2019 CBC. <br />8. Verify that existing accessible restrooms are compliant with 2019 CBC. <br />9. Clarify accessible path of travel from public right of way. <br />10. Construction and demolition recycling shall comply with 2019 CalGreen. <br />11. Title 24 required for existing and new mechanical, electrical and plumbing. <br />12. 2019 CalGreen Non -Residential Mandatory Checklist required. <br />13. Specify staff restroom from children's restroom. <br />14. Provide play yard, occupant load, surface material, location of, play <br />equipment, required exists, and exterior lighting. <br />15. Show location of children storage area of personal items, napping and dining <br />area. <br />16. Clarify if snack space is the main kitchen for children and staff. <br />17. Located staff break room. <br />18. Clarify activities in each learning area. <br />19. Provide attachment of all bookshelves. <br />20. Clarify what cold storage is going to be used for. <br />21. Verify existing mechanical and ventilation systems. <br />22. Clarify if there will be a diaper changing area. <br />23. Project shall comply with 2019 CBC Chapter 4 section 451. <br />V. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br />A. The proposed project shall comply with all Applicable Code and City ordinances, <br />policies and regulations. <br />B. The applicant shall request building and/or fire permits to upgrade required <br />infrastructure, as required by the Alameda County Fire Department. Prior to issuance <br />of a building permit and fire clearance for occupancy, the conditions of approval <br />below shall be met. Additional items may be required at the discretion of the Alameda <br />County Fire Department. <br />1. The project needs to state the construction type on the plans. <br />Agreement to Conditions June 12, 2020 <br />PLN19-0072 Page 6 of 9 <br />