Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 5/3/2024 <br />Brown Reynolds Watford Architects, Inc. for Fire Stations 9, 12 & 13 Programming and Cost Estimates <br /> Exhibit A – Page 2 of 4 <br /> <br /> <br />• Geological Hazard Report per Essential Service Facility Guidelines to review potential hazards <br />including flooding, liquefaction, and near-fault seismic liabilities. The ground acceleration <br />factors and general depiction of the soil characteristics. <br />• Cone Penetration Test (CPT) for each site to analyze the potential for soil liquefaction. <br /> <br />Task 1 Deliverables <br />a. Facility assessment report including text and photos <br />b. Topographic survey <br />c. Site analysis diagrams and text, describing both climactic and development factors. <br />Geological Hazard Report, including CPT test results <br /> <br />Task 2 – Fire Programming & Concept Design for Replacement <br />a. Operations interviews and report <br />• Attend meetings with appropriate City and ACFD staff and management to determine the <br />programmatic needs and requirements specific to each fire station. <br />• Production of the Operations Report that documents how the responsibilities, personnel, and <br />procedures of the new facility fit into the operation of the fire department. <br />b. Space Needs Program <br />• Program components to be considered include office work/operational areas, apparatus bays, <br />living quarters, kitchen facilities, training/exercise equipment, maintenance, storage, and <br />accessibility requirements <br />• Production of Component Designs, which are individual floor plans characterizing the layout <br />and features of each space. These plans show equipment and furnishings as well as the <br />special environmental needs (like sound, air, and light) that are unique to the space and <br />function. Each Component Design will include a listing of the space function(s) and support <br />equipment. <br />• The program documentation will include space requirement outside the building footprint such <br />as space for staff and visitor parking, drive-through apparatus bays, crew parking, mutual aid <br />apparatus staging, and sandbag filling stations. <br />• Production of Space Relationship diagrams and conceptual layouts to demonstrate the space <br />requirements. The functional review will include critical operations such as the variety of <br />emergency responses, standard support / supply operations, shift change, and meal <br />preparation routines. <br />c. Total Space Needs Calculation <br />• Calculation of total space needs achieved through the compiling of the results of the <br />component designs and including allocations for circulation, building systems, and contingency. <br />d. Fire Station Replacement Concept Design <br />• Production of stacking plan alternatives to investigate arrangement options ideas and solutions. <br />The alternatives will include a set of interior space arrangement and site circulation studies for <br />review. The studies will include the site coordination of emergency personnel vs. visiting public <br />function and the primary and secondary apparatus routes and parking. <br />• Refinement of the selected alternative for each fire station, including both the floor plan(s) and <br />a 3D massing study of the refined design concept. <br /> <br />Docusign Envelope ID: 7B06133C-4116-479F-AB57-F52100A4C9BE