My WebLink
|
Help
|
About
|
Sign Out
Home
Complete_with_DocuSign_San_Leandro_and_Waste
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Complete_with_DocuSign_San_Leandro_and_Waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2025 8:52:40 PM
Creation date
9/12/2024 5:32:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/12/2024
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />July 15, 2024 Page 21 City of San Leandro Post Collection <br />Processing operations and equipment as described in Exhibit G be unable to reduce 785 <br />contamination levels of Accepted Source Separated Food Scraps to three percent (3%) on a 786 <br />consistent basis, the Parties shall promptly meet and confer to discuss strategies for reducing 787 <br />contamination levels. Contractor shall be responsible for demonstrating actual contamination 788 <br />levels in a manner reasonably satisfactory to the Contract Manager. Contractor shall continue to 789 <br />Accept all Source Separated Food Scraps delivered by Collection Contractor that meets the 790 <br />contamination thresholds as described in this Section during the meet and confer period. 791 <br />Contractor shall not implement any changes to the contamination monitoring procedures 792 <br />described in this Section without the prior written approval of the City Contract Manager. 793 <br />5.2.4 Days and Hours of Operation 794 <br />A. General. Contractor shall operate the Approved Facility(ies) for the receipt of City Delivered 795 <br />Materials in accordance with the days and hours of operation set forth in its permits and as specified 796 <br />below. 797 <br />1. At a minimum, Contractor shall Accept Residential Organic Materials at the Approved 798 <br />Residential Organic Materials Processing Facility from Monday – Thursday, 6 a.m. – 4 p.m. and 799 <br />Fridays 6 a.m. – 6 p.m., except for Holidays. 800 <br />2. At a minimum, Contractor shall Accept C&D Debris at the Approved C&D Processing Facility 801 <br />and Source Separated Food Scraps at the Approved Commercial Organic Materials Processing 802 <br />Facility from Monday – Friday, 4 a.m. – 9 p.m., Saturday 5 a.m. – 3 p.m., except for Holidays. 803 <br />3. At a minimum, Contractor shall Accept Solid Waste at the Approved Disposal Facility from 804 <br />Monday – Friday, 12:00 a.m. – 11:59 p.m., Saturday 4 a.m. – 12 p.m., except for Holidays. 805 <br />While Contractor may increase these hours, Contractor may not reduce the hours or total number 806 <br />of hours for Acceptance of City Delivered Materials without the concurrence of City and Collection 807 <br />Contractor, unless reductions are required by a change in a permit subsequent to the Effective 808 <br />Date. 809 <br />B. Holiday Schedule. Contractor, at its sole discretion, may choose not to provide Post-Collection 810 <br />Services on a Holiday. In such event, Contractor shall provide Post-Collection Services on the 811 <br />Business Day following the Holiday closure. Contractor shall not change its designation of Holidays 812 <br />or Holiday-related closures of Approved Facilities without prior, written, approval by the City. 813 <br />Contractor shall make any requested changes to a Holiday schedule no less than six (6) months in 814 <br />advance of the requested Holiday change. 815 <br />5.2.5 Equipment and Supplies 816 <br />Contractor shall equip and operate the Approved Facilities in a manner to fulfill Contractor’s obligations 817 <br />under this Agreement. Contractor is solely responsible for the adequacy, safety, and suitability of the 818 <br />Approved Facilities. Contractor shall modify, enhance, and/or improve the Approved Facilities as needed 819 <br />to fulfill Post-Collection Services under this Agreement. Contractor shall provide all rolling stock, 820 <br />stationary equipment, material storage containers, spare parts, maintenance supplies, Processing 821 <br />equipment, and other consumables as appropriate and necessary to operate the Approved Facilities and 822 <br />provide all Post-Collection Services required by this Agreement. Contractor shall place the equipment in 823 <br />the charge of competent operators. Contractor shall repair, maintain, and as necessary, replace all 824 <br />equipment at its own cost and expense. 825 <br />Docusign Envelope ID: C78C62DE-8589-496F-8F5A-DEC38EE5853C
The URL can be used to link to this page
Your browser does not support the video tag.