<br /> <br />Page 42 of 65 <br /> <br />• Catalytic Infrastructure #3 Draft 30% Design Engineering Concepts and Cost Estimates <br />• Catalytic Infrastructure #3 Final 30% Design Engineering Concepts and Cost Estimates <br />Optional Task 7.O.2 Supplemental Future Utility Surveying <br />Future surveying may be needed to locate utilities once a development plan is established to <br />validate tie-ins or relocation of existing utilities and determine if there are potential crossing <br />conflicts with the gravity utilities that will need to feed future development or be relocated to <br />serve future development. This, in conjunction with a potholing plan, would be an action item <br />within the final Development Plan. <br /> <br />Deliverables: <br />• Utility Survey (CAD) <br />7.4 Public Realm Infrastructure Cost Estimate <br />BKF will provide a class 3 or 4 engineer’s cost estimate of construction costs (class dependent <br />upon the level of detail and known construction elements) that would include contingencies and <br />be based on current estimates of the construction costs. This estimate would be based on unit <br />costs from similar work in the Bay Area. <br /> <br />An order of magnitude cost estimate will be prepared for the public improvement elements of <br />the project. These improvements will include: <br />● New Roadway/Roadway Rehabilitation including sidewalks, curbs, trees, landscaping, <br />furnishings, stormwater treatment, new utilities within the roadway right of way corridor <br />(cost per lineal footage) <br />● New Utilities/Utility Rehabilitation including public water, wastewater, storm drainage, <br />and other utilities outside of the public right of way (cost per lineal footage). <br />● New/Modified Traffic Signalization (lump sum cost based on the level of modification or <br />size of the roadways) <br />● Public Parks/Plazas including sidewalks, trees, landscaping, stormwater treatment, <br />etc.(cost based on a square foot cost for the plaza) <br />● Flood Plain Grading including fill to raise the areas out of the flood plain (cost based on <br />gross cubic yardage of import) <br />● Crossings (cost based on square footage of structure or based on lineal foot cost of <br />crossing length) <br /> <br />Public Realm infrastructure costs will be listed in a spreadsheet. Where known, private <br />infrastructure costs vs. public infrastructure costs will be identified. <br /> <br />Deliverables: <br />• Admin Public Realm Infrastructure Cost Estimate (spreadsheet) <br />• Draft Public Realm Infrastructure Cost Estimate (spreadsheet) <br />• Final Public Realm Infrastructure Cost Estimate (memo) <br />Docusign Envelope ID: 885601F4-01B5-4FAB-A341-08EBC29876AA