My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Amendment_3_Final
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
Climatec_Amendment_3_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 4:57:36 PM
Creation date
3/6/2025 4:57:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment No. 3 to Installation <br />Agreement between City of San Leandro and 02/12/2025 <br />Climatec LLC for WPCP Efficiency Projects Page 5 of 7 <br /> <br /> <br />Blower Replacement and New Shelter Structure with Pad <br /> <br />Replace existing Lamson Blower #2 with a new high efficiency turbo blower to <br />match existing Blower #3 model currently in use. <br />o Scope of Work Includes: <br />• Engineering design, consistent with plans dated 10/21/2021, pending <br />approval by the City Engineer <br />• Site preparation <br />• Equipment pads as required <br />• Demolition, removal and disposal of the existing Lamson Blower #2 <br />• Six foot by twelve foot extension of the concrete blower decking to <br />accommodate new equipment <br />• Relocation of the existing ground-mounted jockey compressor/blower <br />• Provide and install one (1) new turbo blower <br />• Provide and install all necessary discharge piping <br />• Electrical disconnect and reconnect <br />• Electrical conduit and required panels/connections <br />• SCADA programming for the addition of this equipment <br />• Start-up and testing of equipment and system operation. <br />o Scope of Work Excludes: <br />• Any work inside the existing blower building <br />• No relocation of the electrical enclosures on the blower deck <br />• Any SCADA upgrades <br /> <br />Heat Loop Pump Replacement <br />Replace two (2) existing 5 HP recirculation pumps in the Digester #4 Control <br />Building with new high efficiency pumps of similar capacity and performance. <br />o Scope of Work Includes: <br />• Demolition, removal and disposal of the existing heat loop pumps <br />• Electrical disconnect and reconnect <br />• Provide and install all necessary discharge and suction piping <br />• Insulate any new or exposed pipe affected by the installation of the <br />new equipment <br />• Provide and install two (2) new high efficiency recirculation pumps <br />• Start-up and testing of equipment and system operation. <br />o Scope of Work Excludes: <br />• Draining or flushing of the hot water loop <br />• Controls or SCADA upgrades <br />Docusign Envelope ID: 6BEB24F4-5845-43B0-B263-0568B625C51E
The URL can be used to link to this page
Your browser does not support the video tag.