My WebLink
|
Help
|
About
|
Sign Out
Home
5D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250317
>
5D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:06:16 PM
Creation date
9/9/2025 10:45:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/17/2025
Retention
Perm
Document Relationships
Reso 2025-023 ACCO Engineering Golf Irrigation Station Repair
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN THE CITY COUNCIL OF THE CITY OF SAN LEANDRO <br />RESOLUTION NO. 2025-XXX <br />RESOLUTION TO APPROVE AND AUTHORIZE THE CITY MANAGER TO EXECUTE A NON- <br />PROFESSIONAL SERVICES AGREEMENT WITH ACCO ENGINEERED SYSTEMS FOR GOLF IRRIGATION <br />STATION REPAIR PHASE 2 FOR $167,552.65 AND TO NEGOTIATE AND APPROVE CUMULATIVE <br />CHANGE ORDERS UP TO 15% OR $25,132.90 OF THE ORIGINAL CONTRACT AMOUNT, FOR A TOTAL <br />NOT-TO-EXCEED AMOUNT OF $192,685.55 <br />WHEREAS, the Golf Irrigation Station supplies recycled water from the City’s Water Pollution <br />Control Plant to the Monarch Bay Golf Course; and <br />WHEREAS, the supply of this recycled water saves potable water resources, reduces irrigation <br />costs for the Golf Course, and lowers nutrients entering the Bay; and <br />WHEREAS, in August 2023, the pump casing structure developed a leak and the station was <br />taken out of service; and <br />WHEREAS, in summer 2024, the City contracted with ACCO Engineered Systems to remove the <br />structure and install temporary piping to restore the station to service; and <br />WHEREAS, this second phase of the project will install a new casing structure to return the <br />station to normal operations. <br />NOW, THEREFORE, the City Council of the City of San Leandro does RESOLVE as follows: <br />That said agreement is hereby approved and execution by the City Manager is hereby authorized; and <br />That the City Manager or her designee is authorized to negotiate and approve cumulative change <br />orders up to a maximum of 15% of the original contract amount. <br />Introduced by Councilmember _______________ and passed and adopted this 17th day of March <br />2025 by the following vote: <br />AYES: () <br />NOES: () <br />ABSENT: () <br />ATTEST: <br />Kelly B. Clancy, CMC <br />City Clerk DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.