My WebLink
|
Help
|
About
|
Sign Out
Home
5D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250317
>
5D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:06:16 PM
Creation date
9/9/2025 10:45:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/17/2025
Retention
Perm
Document Relationships
Reso 2025-023 ACCO Engineering Golf Irrigation Station Repair
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between May 28, 2024 <br />City of San Leandro and ACCO Engineered Systems —Exhibit A Page 1 of 1 <br /> <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Lift Pump Can Procurement. Lift Pump Can and Pump Installation <br />Project Overview – Procurement and installation of a like-for-like pump can, concrete kicker, soil <br />backfill, shoring removal, concrete pedestal installation, pump installation, pump bolt up, copper <br />drain line reconnection, and off haul/dispose of stockpiled soil <br />• Procure like-for-like pump can, hardware, gaskets and, miscellaneous material <br />(disposal of the original pump can is included) <br />• Install the pump can in the previously excavated area of work utilizing the existing <br />piping points of connection <br />• Pour a concrete kicker at the base of the pump can <br />• Backfill; the work area with recycled AB <br />• Removal of the rental shoring <br />• Installation of an 4’x4’x1’ concrete pedestal <br />• Installation of the existing pump into the pump can <br />• Pump bolt up to the existing piping points of connection <br />• Reconnection of an existing copper drain line <br />• Off haul and disposal of the old pump can, misc. materials <br />• All stockpiled soil will either be relocated on site or off hauled to an approved disposal facility <br />General Provisions and Clarifications: <br />• All work is to be performed during normal working hours on a continuous <br />working schedule coordinated with the customer. <br />• Any repairs or modifications to the lift pump itself are excluded from this scope. <br />• Electrical and pump startup are excluded and the responsibility of the customer. <br />• Restoration of landscaping or surface areas disturbed during excavation is excluded <br />unless explicitly stated otherwise. <br />• Any unforeseen site conditions requiring additional work beyond the scope outlined <br />are excluded and may incur additional costs. <br />• Abatement, if found, is not included in the above scope of work. <br />• Any items not specifically listed above are excluded. <br />• ACCO will not be responsible for any pre-existing conditions which are not currently in compliance <br />with local mechanical and electrical codes. <br />• It is assumed that there is no permitting required for this effort. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.