My WebLink
|
Help
|
About
|
Sign Out
Home
5D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250317
>
5D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:06:16 PM
Creation date
9/9/2025 10:45:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/17/2025
Retention
Perm
Document Relationships
Reso 2025-023 ACCO Engineering Golf Irrigation Station Repair
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.00 <br />Detailed Scope of Work <br />Hayes MorehouseTony FiniTo:From: <br />ACCO Engineered Systems PACIFIC SOUTH - City of San Leandro <br />888 East Walnut Street 835 East 14th Street <br />Pasadena, CA 91101 San Leandro, CA 94577 <br />No Data Input 510-577-3437 <br />Work Order Number: <br />January 14, 2025Date Printed: <br />124779.02 <br />San Leandro - Replacement of vertical turbine pump can Irrigation Pump Can Replacement Phase 2 SupplementalWork Order Title: <br />Brief Scope:See DSOW. <br />Revised FinalPreliminaryX <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the <br />items set forth below shall be considered part of this scope of work. <br />See attached. <br />Subject to the terms and conditions of EZIQC Contract CA-R3-HVAC02-123021-AES. <br />Contractor Date <br />DatePACIFIC SOUTH - City of San Leandro <br />Page 1 of 1 <br />1/14/2025 <br />Scope of Work
The URL can be used to link to this page
Your browser does not support the video tag.