Laserfiche WebLink
4.00 <br />Contractor's Price Proposal - Summary <br />Owner PO #: <br />San Leandro - Replacement of vertical turbine pump can Irrigation Pump Can Replacement Phase 2 <br />Supplemental <br />124779.02 <br />CA-R3-HVAC02-123021-AESIQC Master Contract #: <br />Work Order #: <br />Title: <br />Re: <br />January 14, 2025Date: <br />Proposal Value: <br />Contractor: ACCO Engineered Systems <br />$167,552.65 <br />$134,259.98Section - 01 <br />$4,562.32Section - 02 <br />$15,473.76Section - 10 <br />$13,256.59Section - 23 <br />Proposal Total <br />Thisl total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$167,552.65 <br />The Percentage of NPP on this Proposal:% <br />Page 1 of 1 <br />1/14/2025 <br />Contractor's Price Proposal - Summary