My WebLink
|
Help
|
About
|
Sign Out
Home
5D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250317
>
5D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:06:16 PM
Creation date
9/9/2025 10:45:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/17/2025
Retention
Perm
Document Relationships
Reso 2025-023 ACCO Engineering Golf Irrigation Station Repair
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:124779.02 <br />San Leandro - Replacement of vertical turbine pump can Irrigation Pump Can Replacement <br />Phase 2 Supplemental <br />Section - 01 <br />01 22 23 00 0425 0066 For Equipment Without Operator, Deduct9 -$14,331.21MOD <br />Installation =x x -14,331.21 <br />FactorUnit PriceQuantity Total <br />-3,990.87 1.4364 2.50 <br />01 22 23 00 1395 6-1/2 Ton Capacity, 16' To 22' Bed, 4 x 2 Flat Bed Truck With Full-Time Truck <br />Driver <br />10 $1,465.16DAY <br />Installation =x x 1,465.16 <br />FactorUnit PriceQuantity Total <br /> 1,020.02 1.4364 1.00 <br />Allotment For ACCO Pump Housing Delivery <br />01 22 23 00 1420 6 CY Rear Dump Truck With Full-Time Truck Driver11 $19,572.56WK <br />Installation =x x 19,572.56 <br />FactorUnit PriceQuantity Total <br /> 4,542.04 1.4364 3.00 <br />Allotment For Dump Truck Equipment For Dirt Fill . Now Also Includes allotment For Dedicated Debris Disposal <br />Truck Accommodation <br />01 22 23 00 1420 0039 For Equipment Without Operator, Deduct12 -$13,891.83MOD <br />Installation =x x -13,891.83 <br />FactorUnit PriceQuantity Total <br />-3,223.76 1.4364 3.00 <br />01 45 23 00 0112 Testing For The Presence Of Polychlorinated Biphenyl (PCB) In Soil, Analysis <br />Per Sample <br />13 $247.43EA <br />Installation =x x 247.43 <br />FactorUnit PriceQuantity Total <br /> 172.26 1.4364 1.00 <br />Soil Testing <br />$134,259.98Subtotal for Section - 01 <br />Section - 02 <br />02 32 19 00 0002 Test, Entry/Exit Pit Excavation, Backfill And Compaction, By Machine, Unpaved <br />Areas <br />14 $2,081.34CY <br />Installation =x x 2,081.34 <br />FactorUnit PriceQuantity Total <br /> 72.45 1.4364 20.00 <br />Compaction Testing <br />02 41 19 13 0346 12" Thick Reinforced Concrete Elevated Slab Cutouts, <24 SF15 $2,026.88SF <br />Installation =x x 2,026.88 <br />FactorUnit PriceQuantity Total <br /> 64.14 1.4364 22.00 <br />Concrete Above Ground. including hand mix pour of concrete cap. <br />02 61 13 00 0005 Disposal Fees Of Non-Petroleum Contaminated Soil16 $454.10CY <br />Installation =x x 454.10 <br />FactorUnit PriceQuantity Total <br /> 52.69 1.4364 6.00 <br />Material Disposal Fee Allowance <br />$4,562.32Subtotal for Section - 02 <br />Section - 10 <br />10 14 56 00 0010 Foundation For Sign Excavation, Backfill, Compaction, Concrete, Rebar, <br />Forms And Finish <br />17 $15,473.76CY <br />Installation =x x 15,473.76 <br />FactorUnit PriceQuantity Total <br /> 538.63 1.4364 20.00 <br />Concrete And Dirt Fill Below Ground. Including hand mix pour of the footing. <br />$15,473.76Subtotal for Section - 10 <br />Section - 23 <br />Page 2 of 3 <br />1/14/2025 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.