Laserfiche WebLink
5.00 <br />Contractor's Price Proposal - Detail <br />San Leandro - Replacement of vertical turbine pump can Irrigation Pump Can Replacement Phase <br />2 Supplemental <br />124779.02 <br />CA-R3-HVAC02-123021-AESIQC Master Contract #: <br />Work Order #: <br />Owner PO #: <br />Title: <br />Re: <br />January 14, 2025Date: <br />Proposal Value: <br />Contractor: ACCO Engineered Systems <br />$167,552.65 <br />(Excludes)Equip.MaterialLabor <br />Line TotalDescriptionUOMMod.ItemSect. <br />Section - 01 <br />01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible <br />costs as directed by Owner. Insert the appropriate quantity to adjust the base <br />cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, <br />list each one separately and add a comment in the "note" block to identify the <br />Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended <br />warranty, expedited shipping costs, etc.). A copy of each receipt shall be <br />submitted with the Price Proposal. <br />1 $3,976.21EA <br />Installation =x x 3,976.21 <br />FactorUnit PriceQuantity Total <br /> 1.00 1.2154 3,271.52 <br />*** PAYMENT AND PERFORMANCE BONDS PER SOURCEWELL AGREEMENT 2% of $163,576.44 = <br />$3,271.52 <br />01 22 20 00 0100 Steam / Pipe Fitter Maintenance Crew With Truck And ToolsThis task will be <br />used specifically for maintenance service calls. <br />2 $86,770.05HR <br />Installation =x x 86,770.05 <br />FactorUnit PriceQuantity Total <br /> 167.80 1.4364 360.00 <br />- Allotment for 3 Field/Work members 3 weeks of core underground work / installation (360 Hours ST). <br />Includes Crew Individual Truck Fee . <br />01 22 23 00 0151 1,600 CFM Diesel Powered Portable Air Compressor3 $13,862.52WK <br />Installation =x x 13,862.52 <br />FactorUnit PriceQuantity Total <br /> 3,216.96 1.4364 3.00 <br />Allotment For Air Compressor Accommodation For Tool & Equipment <br />01 22 23 00 0286 2,500 LB Capacity, 78" Wide, Tracked Skid-Steer Loader With Full-Time <br />Operator <br />4 $23,027.12WK <br />Installation =x x 23,027.12 <br />FactorUnit PriceQuantity Total <br /> 5,343.71 1.4364 3.00 <br />Allotment For Loader Equipment Accommodation <br />01 22 23 00 0286 0066 For Equipment Without Operator, Deduct5 -$16,300.11MOD <br />Installation =x x -16,300.11 <br />FactorUnit PriceQuantity Total <br />-3,782.63 1.4364 3.00 <br />01 22 23 00 0357 1-1/8 To 1-1/4 CY Hydraulic Excavator With Full-Time Operator6 $26,641.34WK <br />Installation =x x 26,641.34 <br />FactorUnit PriceQuantity Total <br /> 7,418.92 1.4364 2.50 <br />Allotment For Excavator Accommodation For The Duration of The Underground Access Work. <br />01 22 23 00 0357 0066 For Equipment Without Operator, Deduct7 -$14,331.21MOD <br />Installation =x x -14,331.21 <br />FactorUnit PriceQuantity Total <br />-3,990.87 1.4364 2.50 <br />01 22 23 00 0425 1/2 To 5/8 CY, 65 HP, Loader-Backhoe With Standard Bucket And Full -Time <br />Operator <br />8 $17,551.95WK <br />Installation =x x 17,551.95 <br />FactorUnit PriceQuantity Total <br /> 4,887.76 1.4364 2.50 <br />Allotment For Backhoe Equipment Accommodation <br />Page 1 of 3 <br />1/14/2025 <br />Contractor's Price Proposal - Detail