My WebLink
|
Help
|
About
|
Sign Out
Home
5E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250407
>
5E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:57:24 PM
Creation date
9/15/2025 9:06:49 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/7/2025
Retention
Perm
Document Relationships
Reso 2025-030 Lease Agreement with Fluence Corporation
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> <br />Appendix 3 – Preliminary Equipment Specification <br /> <br />The following specifications refer to the suggested plant design as presented in Appendix 1. <br /> <br />Component Specification Quant <br />ity <br />Respon <br />sibility <br />/ <br />Supply <br />by <br />Comments <br /> <br />Aspiral L5 <br />40 ft. special design tank 5 x T2 MABR <br />towers Coarse bubble diffusers <br />Internal piping, fittings and valves <br /> <br />1 <br /> <br /> <br /> <br />Flu <br />enc <br />e <br /> <br /> <br />Equipment Skid <br />Process air blower: 190 NCFM @ 0.725 <br />PSIG <br />1 To be installed on <br />external skid. <br />Skid NOT covered Mixing air blower: 117 NCFM @ 4.35 PSIG 1 <br />Aspiral feed pump 1 <br />Electrical and Control 1 Basic with optional <br />upgrade <br />Secondary effluent <br />dichlorination <br /> <br />To provide dechlorinated effluent to <br />Aspiral <br />1 <br /> <br /> <br />Ot <br />her <br />s <br />TBD <br />FOG trap 1 Necessary only if FOG <br />>60 mg/l <br />Concrete floor According to detailed design made by <br />certified constructor 1 TBD <br />Aspiral L5 Inlet & <br />Outlet Piping, <br />fittings and valves <br /> <br />According to detailed design 1 <br />1. Some of the equipment's specifications might change in accordance with the design detailed. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.