Laserfiche WebLink
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 4 of 14 <br />e. Track and manage quality non-conformances (i.e., when QC or QA data do not meet <br />acceptance criteria specified in the contract documents), including: <br />i. Document and track quality control/acceptance non-conformances in the project Non- <br />Conformance Log. <br />ii. Work with the City and Contractor to develop corrective measures. <br />iii. Review additional work to remedy non-conformances, and <br />iv. Document resolution in the Non-Conformance Log. <br />12. Document and map construction progress using a drone to periodically photograph the pond area: <br />a. Aerial photos of the pond area can be georeferenced to allow quantification of progress and <br />comparison with Contractor reporting. <br />b. The drone will be operated by a FAA-licensed Terraphase staff level field managers while they <br />are on-site. <br />c. Based on initial review, the site is eligible for low-altitude drone usage under the FAA Low <br />Altitude Authorization and Notification Capability, which requires notification approximately 1 <br />week before drone usage. <br />13. Lead review of Contractor applications for payment, including review and required verification of the <br />following: <br />a. The quantity of billed work per the contracted Schedule of Values. <br />b. That the quality of billed work conforms to the contract requirements and any unresolved non- <br />conformances are excluded. <br />c. That required submittals have been approved. <br />d. Contract financial status, including billing period and total project spend, budget remaining, <br />contract changes. <br />14. Manage the construction closeout process, including <br />a. Planning and facilitating closeout inspections with the City and Contractor <br />b. Provide engineering and contract compliance review of the Contractor’s substantial <br />completion application and punch list <br />c. Plan and facilitate inspection of the Contractor’s completed punch list <br />d. When appropriate, provide recommendation to the City to issue final completion approval to <br />the Contractor. <br />15. Prepare Record Drawings based on the red-lined, marked-up field construction drawings from the <br />General Contractor <br />16. Perform budget tracking, invoicing, and associated financial management of the Terraphase contract <br />with the City for this project. <br />The above-described overall scope of work varies based on the operational phase of the project, which are <br />detailed in the following phase-based tasks. <br />Task 1: Premobilization Phase Engineering, CM, Compliance Management <br />The premobilization phase of the project is defined as the period beginning with City issuance of Notice to <br />Proceed to the Contractor and ending with the start of Contractor mobilization to the site. This phase typically <br />includes project kickoff meetings, and preparation, submittal, and review (as specified in the contract