My WebLink
|
Help
|
About
|
Sign Out
Home
5I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:14:16 PM
Creation date
9/15/2025 4:49:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-080 for Amendment 4 to CSA with Terraphase
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 5 of 14 <br />documents) of Terraphase and Contractor premobilization operational plans and submittals, especially plans <br />and submittals that require approval before the Contractor is authorized to mobilize to the Site. <br />Terraphase will provide engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the <br />premobilization phase of the project and as further defined below: <br />• Purchase a one-year project-specific Procore license and set up the Procore CMIS for the project. The <br />vendor cost of the Procore license is based on an April 24, 2025 quote. <br />• Prepare a revision of the existing Terraphase Site-Specific Health and Safety Plan to incorporate <br />Terraphase scope during construction of the Stabilization Project. <br />• Prepare the project QA Checklist. <br />• Prepare templates for all reporting and documentation to be completed by Terraphase during the <br />Stabilization Project. <br />• Plan, facilitate, and document minutes for the project kickoff meeting. <br />• Review, provide comments, and/or approve the following initial Contractor submittals: <br />o Stabilization Operations Plan <br />o Stabilization Construction Quality Control Plan <br />o Fill Work Plan and Schedule <br />o 811 tickets and utility response information <br />o Construction Health and Safety Plans <br />o Stabilization Construction Schedule (initial) <br />o Dewatering System Work Plan (if submitted during this phase, not required for initial <br />mobilization) <br />o KMEP vehicle crossing approval <br />• One half-day site visit for on-site coordination/planning with the Contractor (including possibly <br />facilitating Contractor utility clearance if needed) and City and/or to attend the project kickoff <br />meeting. <br />The assumed duration of this phase, based on review of the provisionally awarded contractor’s proposal, is 3 <br />work weeks. <br />Task 2: Mobilization/Site Setup Phase Engineering, CM, Compliance Management <br />The Mobilization/Site Setup phase of the project is defined as the period beginning with Contractor <br />mobilization to the site and ending with the initiation of sludge-soil-cement stabilization operations. <br />Construction activities completed during this phase will be described in the initial Contractor schedule and <br />submittals, but is expected to include continued submittal preparation and review, underground utility <br />coordination, installation of the Contractor’s temporary construction support facilities, setup of environmental <br />controls, delivery and setup of stabilization construction equipment, delivery and staging of materials, <br />demolition of site features as described in the plans and specifications, stabilization work platform <br />construction, and initial stockpile management. <br />Terraphase will provide engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the <br />Mobilization/Site Setup phase of the project and as further detailed below:
The URL can be used to link to this page
Your browser does not support the video tag.