My WebLink
|
Help
|
About
|
Sign Out
Home
5I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:14:16 PM
Creation date
9/15/2025 4:49:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-080 for Amendment 4 to CSA with Terraphase
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 9 of 14 <br />Terraphase will provide all engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the Fill <br />phase of the project, and as further detailed below: <br /> <br />• Provide onsite engineering, CM, and CGP compliance field oversight and technical assistance: <br />o Terraphase staff level field manager: <br /> Full time during Weeks 1-2 of fill operations, assuming a Mon-Fri work week and <br />maximum 50 hours per week. <br /> 2 days on site per week during Weeks 3-6 (8 days on site during this period) <br />The Terraphase field manager will perform the following activities when on-site: <br /> Oversee Contractor operations, including observing and confirming that Contractor’s <br />quality control operations are in accordance with the approved Contractor <br />Construction QC Plan. <br /> Quantitative and qualitative documentation of construction progress, including <br />preparing schematics of where work is complete, active work locations, where work <br />has not started. <br /> Track and manage contractor QC data, including noting the physical location of each <br />QC sample location on project drawings. <br /> Perform Engineer’s independent QA sampling. <br /> Complete required daily SWPPP BMP inspections and support required weekly and <br />monthly SWPPP QSD/QSP inspections. <br /> Inspect materials received on-site against the Contractor’s relevant approved <br />submittal. <br /> Provide field support for review and resolution of RFIs, including potentially collecting <br />data, coordinating with the Contractor, discussing potential means of resolution with <br />the Contractor, off-site Engineering personnel, and the City, and documenting these <br />discussions. <br /> Provide field support for identifying, tracking, and resolving construction quality <br />issues, including coordination with Contractor and City staff. <br /> Support contract change management, including measuring/confirming change <br />quantities, reviewing change requests, coordination with Contractor, Engineering <br />personnel, and the City. <br /> Conduct on-site pay application site meeting with Contractor prior to formal submittal <br />and/or for review and recommendation to City after submittal. <br /> Attending Contractor daily health and safety tailgate meetings when Terraphase <br />personnel are on site. <br /> Prepare and submit a Daily CM/Engineering/QA Report after each day of on-site <br />oversight. This report will include a summary of work performed, CM activities, <br />Engineering support activities, QA activities, technical/production issues encountered, <br />representative photos, and a 1-week lookahead of significant CM/engineering/QA <br />tasks. <br />o Terraphase engineering/CM lead: <br /> 1 day on site per week during Weeks 1-2 of (2 total days on site)
The URL can be used to link to this page
Your browser does not support the video tag.