My WebLink
|
Help
|
About
|
Sign Out
Home
5I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:14:16 PM
Creation date
9/15/2025 4:49:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-080 for Amendment 4 to CSA with Terraphase
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 10 of 14 <br /> 1 partial day on site per week during Weeks 3-6 of stabilization operations (4 partial <br />days on site) <br />o Terraphase Geotechnical Engineering Subject Matter Expert: 1 partial day site visit during fill <br />operations to review operations and provide technical support if needed. <br />• Conduct monthly QSD/QSP dry-weather SWPPP inspections, weekly on-site BMP inspections, and any <br />pre-, during-, and post-storm inspections that take place during this phase of work. <br />• Conduct off-site engineering, QA, CM, and CGP support, including reviewing and resolving RFIs, <br />preparing design modifications and technical field orders, submittal review, QA reporting, and <br />compliance reporting as described in the Engineering, Construction, and CGP Compliance <br />Management Scope of Work. <br /> <br />This task assumes a 6-week total duration for this phase of the Stabilization Project for on-site oversight and <br />management scope, based on review of the provisionally selected Contractor’s proposal. If the Contractor’s <br />actual construction schedule requires additional on-site oversight, Terraphase will confirm the additional effort <br />with the City, including requesting additional budget if required. <br /> <br />As this task does not include full-time oversight for the full duration of this phase, the assumed level of effort <br />for this task does not cover any additional required pre-, during-, or post-storm SWPPP BMP inspections during <br />this phase if these are required when Terraphase staff are not already on site. If required, Terraphase will <br />confirm the additional effort with the City, including potentially requesting additional budget. <br />Task 5: Closeout Phase Engineering, CM, Compliance Management <br />The Closeout phase of the project is defined as the period beginning with completion of post-stabilization fill <br />and continuing through installation of the post-fill dewatering system, Contractor closeout inspections and <br />submittals, site cleanup, City issuance of final completion to the Contractor, and demobilization from the Site. <br />Terraphase will provide all engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the <br />Closeout phase of the project, and as further detailed below: <br /> <br />• Oversee installation of the post fill dewatering system, assuming 1 day on-site per week by the <br />Terraphase staff level field manager for 2 weeks (2 total days on-site). <br />• Review, provide comments, and/or approve the following initial Contractor submittals: <br />o Draft and completed project completion punch lists. <br />o Contractor as-built redline markups. <br />o Stabilization Operations Plan <br />• Prepare project Record Drawings based on Terraphase construction QA records and approved <br />Contractor redline markups. <br />• Manage and facilitate the on-site construction closeout process, including Contractor punch-list <br />review, substantial completion inspection, and final completion inspection, including 1 full-day site <br />visit and one partial-day site visit by the Terraphase engineering/CM lead. <br />• Compile and transmit all project documentation to the City for archiving, including closing access to <br />the project CMIS. <br />• Assisting the City as needed for City closeout of their contract with the Contractor.
The URL can be used to link to this page
Your browser does not support the video tag.