Laserfiche WebLink
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 10 of 14 <br /> 1 partial day on site per week during Weeks 3-6 of stabilization operations (4 partial <br />days on site) <br />o Terraphase Geotechnical Engineering Subject Matter Expert: 1 partial day site visit during fill <br />operations to review operations and provide technical support if needed. <br />• Conduct monthly QSD/QSP dry-weather SWPPP inspections, weekly on-site BMP inspections, and any <br />pre-, during-, and post-storm inspections that take place during this phase of work. <br />• Conduct off-site engineering, QA, CM, and CGP support, including reviewing and resolving RFIs, <br />preparing design modifications and technical field orders, submittal review, QA reporting, and <br />compliance reporting as described in the Engineering, Construction, and CGP Compliance <br />Management Scope of Work. <br /> <br />This task assumes a 6-week total duration for this phase of the Stabilization Project for on-site oversight and <br />management scope, based on review of the provisionally selected Contractor’s proposal. If the Contractor’s <br />actual construction schedule requires additional on-site oversight, Terraphase will confirm the additional effort <br />with the City, including requesting additional budget if required. <br /> <br />As this task does not include full-time oversight for the full duration of this phase, the assumed level of effort <br />for this task does not cover any additional required pre-, during-, or post-storm SWPPP BMP inspections during <br />this phase if these are required when Terraphase staff are not already on site. If required, Terraphase will <br />confirm the additional effort with the City, including potentially requesting additional budget. <br />Task 5: Closeout Phase Engineering, CM, Compliance Management <br />The Closeout phase of the project is defined as the period beginning with completion of post-stabilization fill <br />and continuing through installation of the post-fill dewatering system, Contractor closeout inspections and <br />submittals, site cleanup, City issuance of final completion to the Contractor, and demobilization from the Site. <br />Terraphase will provide all engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the <br />Closeout phase of the project, and as further detailed below: <br /> <br />• Oversee installation of the post fill dewatering system, assuming 1 day on-site per week by the <br />Terraphase staff level field manager for 2 weeks (2 total days on-site). <br />• Review, provide comments, and/or approve the following initial Contractor submittals: <br />o Draft and completed project completion punch lists. <br />o Contractor as-built redline markups. <br />o Stabilization Operations Plan <br />• Prepare project Record Drawings based on Terraphase construction QA records and approved <br />Contractor redline markups. <br />• Manage and facilitate the on-site construction closeout process, including Contractor punch-list <br />review, substantial completion inspection, and final completion inspection, including 1 full-day site <br />visit and one partial-day site visit by the Terraphase engineering/CM lead. <br />• Compile and transmit all project documentation to the City for archiving, including closing access to <br />the project CMIS. <br />• Assisting the City as needed for City closeout of their contract with the Contractor.