My WebLink
|
Help
|
About
|
Sign Out
Home
5I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:14:16 PM
Creation date
9/15/2025 4:49:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-080 for Amendment 4 to CSA with Terraphase
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 11, 2025 <br />Proposal for Stabilization Project Construction, Engineering, and Compliance <br />Management and Phase 2 Preconstruction Engineering and Management <br />WPCP Former Polishing Pond <br />City of San Leandro, San Leandro, California <br /> <br /> <br />Terraphase Engineering Inc. Page 12 of 14 <br />construction management support provided by Terraphase during the City’s development of <br />the Stabilization Project RFP. The current contracted scope of work is limited to Terraphase <br />response to technical requests by others and one review of a draft RFP prepared by others. <br />o Management support to the City for the Phase 2 pre-bid conference, including agenda <br />development and conference preparation and development of post-conference actions/next <br />steps. The current contracted scope of work is limited to Terraphase attendance of the pre- <br />bid conference and response to technical requests during conference planning performed by <br />others. <br />• Develop a more extensive Phase 2 cost estimate update than the currently contracted update. The <br />current contracted Terraphase scope of work is limited to removing Stabilization Project line items <br />from the 100% Design cost estimate and escalating existing estimate unit rates to 2025 values using <br />estimating software. The requested additional scope of work includes outreach to material suppliers <br />and subcontractors to provide a more detailed estimate of significant and higher-risk construction <br />tasks, including the MABR system and treatment wetland subgrade liner. <br />• As discussed with the City in May 2025, Terraphase will provide engineering and coordination support <br />with the City and others to integrate the Phase 2 instrumentation and controls (I&C) system into the <br />WPCP I&C system. This was identified as a potential schedule and cost risk to the City, as the currently <br />approved Phase 2 design identifies MABR operational parameters and shows Phase 2 communications <br />cables terminating at a junction box at the WPCP. The objective of the proposed I&C integration effort <br />is to describe the Phase 2 system’s control strategy, how Phase 2 controls are integrated with the <br />WPCP controls system, and how the WPCP controls system displays and controls the Phase 2 system. <br />The deliverable for this effort is a technical memorandum that describes these parameters such that <br />the City’s I&C engineer can design the required I&C infrastructure and WPCP I&C system modifications <br />as needed. Terraphase will be subcontract engineering services from Presidio Systems, Inc. (PSI), and <br />Fluence Corporation (Fluence) to provide I&C engineering support during delivery of this task. <br />• As discussed with the City in May 2025, Terraphase will reevaluate and revise the design of the WPCP <br />effluent tie-in valve. This revision may include potentially changing the valve type (e.g., changing from <br />a gate valve to a butterfly valve), providing a make/model specification for the appropriate motorized <br />actuator for the valve, design of structural valve supports, and potential revision of the specified valve <br />vault to accommodate the confirmed valve, actuator and appurtenances. The objective of this <br />additional design scope is to not scope detailed design of the tie-in valve as contractor design-build <br />scope in the Phase 2 RFP. <br />• As discussed with the City in May and June 2025, Terraphase will facilitate a constructability review of <br />the Phase 2 subgrade liner system. This will include identifying and subcontracting a qualified liner <br />installation contractor, providing Phase 2 project background information and design documents, <br />coordinating with the constructability contractor during their review, and discussing findings with the <br />City. This task does not include revision of Phase 2 project plans, specifications, or cost estimate to <br />incorporate approved design changes identified during the constructability review; any resulting <br />revisions to Phase 2 design documents will be scoped and proposed at City direction after completion <br />of the constructability review. <br />• Update and maintain the Phase 2 project schedule through Phase 2 procurement. Terraphase will <br />prepare an initial Phase 2 schedule under the current Phase 2 design support task, but this schedule
The URL can be used to link to this page
Your browser does not support the video tag.