My WebLink
|
Help
|
About
|
Sign Out
Home
5A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:08:02 PM
Creation date
9/15/2025 4:51:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-084 CSA Sanbell Project No. 2023.4220
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: July 7, 2025 <br />Agenda Number: 5.a. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 25-192 <br />File Type: Staff Report <br />Adopt a Resolution to Approve and Authorize the City Manager to Award a Consultant Services <br />Agreement to Sanbell in the amount of $630,000 for the Hesperian Boulevard Bike Lane Gap Closure <br />Project, Project No. 2023.4220; to Authorize the City Manager to Negotiate and Approve Individual <br />Contract Amendments up to 5% (or $31,500) of the Original Contract Amount; to Authorize the City <br />Manager to Negotiate and Approve Contract Amendments up to a Cumulative Value of 15% (or <br />$94,500) of the Original Contract Amount; and to Appropriate $325,000 in Grant Funding to the Subject <br />Project <br />COUNCIL PRIORITY <br />·Infrastructure <br />·Quality of Life <br />·Public Safety <br />SUMMARY <br />This Consultant Services Agreement (CSA) provides for the design, permitting, and preparation <br />of plans, specifications, and the engineer ’s estimate for the Hesperian Blvd. Bike Lane Gap <br />Closure project. This project will design new Class IV bike lanes along a segment of Hesperian <br />Blvd. between East 14th Street and Bayfair Drive to enhance bicyclist and pedestrian safety in <br />accordance with the 2024 San Leandro Bicycle and Pedestrian Master Plan. <br />RECOMMENDATIONS <br />Staff recommends the following actions: <br />·Award a CSA in the amount of $630,000 to Sanbell for engineering design services for the <br />Hesperian Blvd. Bike Lane Gap Closure <br />·Authorize the City Manager or their designee to negotiate and approve individual contract <br />amendments up to 5% (or $31,500) of the original contract amount <br />·Authorize the City Manager or their designee to negotiate and approve cumulative contract <br />amendments up to 15% ($94,500) of the original contract amount. <br />·Appropriate $225,000 in grant funds from the Alameda County Transportation <br />Commission (ACTC). <br />·Appropriate $100,000 in grant funds from the Metropolitan Transportation Commission <br />(MTC); and <br />·Appropriate $29,249 in City matching funds to the subject project <br />BACKGROUND <br />The project area covers approximately 0.4 miles of Hesperian Blvd. between E. 14th Street and <br />Bayfair Drive. Hesperian Blvd. is a major arterial roadway that begins in San Leandro and <br />Page 1 City of San Leandro Printed on 9/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.