My WebLink
|
Help
|
About
|
Sign Out
Home
5A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:08:02 PM
Creation date
9/15/2025 4:51:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-084 CSA Sanbell Project No. 2023.4220
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised June 2025 <br />Sanbell for Hesperian Bike Lane Gap Closure Exhibit A – Page 4 of 7 <br /> <br />Deliverables: <br /> A Conceptual Design with a rough order of magnitude (ROM) estimate <br /> Memo summarizing the benefits of the proposed modifications for all modes of travel, the results of <br />the public outreach, modifications of the design and mitigation measures that support the Final <br />Conceptual Design. <br /> Final Conceptual Design <br /> <br />Task 4 – 60% Plans, Specifications & Cost Estimate <br /> <br />Following the City’s approval of the proposed layout, the Consultant will incorporate recommendations and <br />comments from review of conceptual design to prepare 60% PS&E. During this task, the Consultant will work <br />closely with City staff to resolve the grading, and drainage impacts. The Consultant will identify and coordinate <br />work with utility agencies for known utilities in conflict. Construction drawing layouts will be displayed on <br />24”x36” size sheets with City standard border. Adequate grades will be included on the plans at the curb <br />ramp locations at the 60% submittal, along with plan view of potential new curb inlets with grades at the <br />corners, where needed. Storm profiles will be part of the 90% submittal, for new pipes that are proposed. The <br />plans will include Construction Staging with Contractor performance criteria (working hours, number of lanes, <br />land widths). The detailed temporary traffic handling plans specifications will be included in the project bid <br />documents to instruct the Contractor to submit their means and methods to be approved by the City. Lane <br />dimensions and stationing for key improvements will be included at the 60% design level, and the detailed <br />station of new improvements will be shown at the 90% submittal. The Consultant will prepare technical <br />specifications and incorporate front end specifications provided by City. Specifications will be prepared in the <br />City’s format. The PS&E documents may include, but are not limited to, the following items: <br /> Cover Sheet with Vicinity Map <br /> Survey/Existing Utility Plans <br /> Demolition Plan <br /> Improvement Plan <br /> Grading Plans <br /> Utility Plans and Drainage Plan <br /> Typical Sections <br /> Landscape Cover sheet, notes, and Legends <br /> Planting Plan and details <br /> Irrigation plan and details <br /> Traffic Signal Plans and/or Electrical Plans <br /> Signing & Striping Plan <br /> Civil Details <br /> Erosion and Sediment Control Plans <br /> If needed, Stormwater Management Plan and Checklist <br /> <br />With the 60% plan set the Consultant shall apply for an encroachment permit for the intersection with E <br />14th Street, if necessary. The Consultant shall identify any other required permits, prepare all permit <br />applications, and handle negotiations relative to permit conditions, if required. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.