My WebLink
|
Help
|
About
|
Sign Out
Home
5A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:08:02 PM
Creation date
9/15/2025 4:51:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-084 CSA Sanbell Project No. 2023.4220
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised June 2025 <br />Sanbell for Hesperian Bike Lane Gap Closure Exhibit A – Page 6 of 7 <br />updated accordingly to address the City's input and finalized for this submittal. Similarly, the engineer’s cost <br />estimate will be revised and finalized to reflect any changes requested during the review process. It is <br />assumed that Sanbell will be responsible for submitting the 90% submittal package to Caltrans as part of the <br />encroachment permit approval process. <br /> <br />The Traffic Engineer will prepare the 100% submittal plans, incorporating all previously developed information <br />and modifying the documents to reflect comments received from both the Caltrans Permits Office and City <br />staff on the 90% plans. It is anticipated that Caltrans will require two rounds of review prior to permit approval; <br />any additional rounds of review beyond this will be addressed through a contract amendment. The technical <br />specifications will be updated to incorporate final staff comments and will be finalized for bidding purposes. <br />Likewise, the engineer’s cost estimate will be revised based on feedback and finalized. Following this, minor <br />editorial comments from the City will be incorporated into the final bid submittal. The bid plans, technical <br />specifications, and cost estimate will be submitted electronically for use during the bidding process. <br /> <br />As Optional Task 7.1, the Traffic Engineer will prepare a traffic signal modification design for a full upgrade <br />of the signal equipment at the Bayfair/Hesperian intersection. The design will include all necessary <br />components for a complete signal replacement and will follow the same review submittal process established <br />in the base project for the minor signal modification at this location. The deliverable for this task will be a PDF <br />of the signal modification design plans. <br /> <br />Also for Optional Task 7.1, the Traffic Engineer will prepare a full signal modification design at the <br />Fairmont/Hesperian intersection. Similar to Task A, the design review submittals will follow the same rounds <br />of review used in the base project for the minor signal improvements at this intersection. The deliverable will <br />also consist of a PDF of the final signal modification design plans. It is noted that the scope of services <br />includes only the tasks specifically identified above; any additional services beyond this scope may be <br />provided on a time and materials basis upon receipt of written authorization. <br /> <br />Deliverables: <br /> Encroachment permit (if needed) <br /> 60% Plans, Specifications and Estimate <br /> Drawings provided in PDF and in AutoCAD format; all xref drawings, pen-setting files, <br />attached images, fonts, and other associated files necessary to produce accurate plotting of <br />the drawings shall be provided. <br /> Technical specifications in Microsoft Word format per the California MUTCD, the Greenbook, <br />Caltrans Standard Specifications, and City of San Leandro Specification. <br /> Coordinate upfront specifications prepared by the City, to recommend specifications for <br />working days, construction surveying, potholing, mobilization, and Contractor classification. <br /> Project cost estimate <br /> <br />Task 5 – 90% Plans, Specifications & Cost Estimate <br /> <br />5.1 The Consultant will review and provide written responses to all design review comments <br />received from the City and other agencies reviewing the 60% documents. If necessary, the <br />consultant will meet with the City and other agencies to resolve issues prior to <br />commencement of the 90% plans. All agreed upon comments will be incorporated into the <br />90% design documents.
The URL can be used to link to this page
Your browser does not support the video tag.