Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 3 of 11 <br />utility potholing has been identified, which can typically support the horizontal and vertical verification of <br />approximately 4-7 PH locations. <br /> <br />5) Soil Testing and Characterization – Although originally excluded, the need for soil testing and <br />characterization is recommended (and possibly needed per Caltrans comments) to manage risks/costs, <br />and support soil export operations, and management of potentially state (or federally) contaminated <br />material. Although the area at Foothill/MacArthur/Superior is generally built-out and capped with <br />impervious materials, we do not know what resides underneath; in fact - Caltrans has commented and <br />alerted BKF that the embankment of I-580 contains Z-2 aerially deposited lead (ADL), and will need to <br />be managed on-site or appropriately disposed of at a certified landfill. Since this project is an export <br />project involving roadway and structural excavation operations, it is highly recommended that soil <br />testing and characterization is conducted to avoid surprises and costly change order; soil <br />characterization findings will be included in the technical specifications, so the bidding contractors are <br />aware and can make plans accordingly for disposal operations and their proposed bids. BKF will <br />coordinate with our hazardous material consultant, Geocon, who will conduct the following services <br />related to Soil Testing and Characterization services: <br /> <br />• Prepare Health and Safety Plan. <br />• Prepare sample analysis matrix and sample location map for Client approval. <br />• Assumes no traffic control needed. And estimated 1 day (2 persons) to complete fieldwork. <br />• Does not include encroachment/access permitting - Geocon will work under Encroachment and <br />Access Permits issued to Client. <br />• Phase II PSI Soil Sampling <br />o Field Activities: <br /> Advance borings to 2.5 feet below ground surface. <br /> Collect soil samples per boring <br /> <br />o Laboratory Analyses: <br /> soil samples for CAM 17 metals <br /> soil samples for soluble (WET or TCLP) single metal (e.g., lead). <br /> soil samples for TPHg/d/mo <br /> soil samples for SVOCs <br /> soil samples for OC Pesticides <br /> soil samples for PCBs <br /> soil samples for VOCs <br /> <br />• Prepare draft Preliminary Site Investigation (PSI) Memo for client review. <br />• Prepare final PSI Report. <br /> <br />Since Z-2 ADL material has already been defined/documented by Caltrans, testing will confirm whether <br />the ADL is State or Federally managed, in the event on-site management (burying, capping, or surface <br />placement) is not feasible in City (or Caltrans) R/W and must be off-hauled. <br /> <br /> <br />Task 2 – 100% PS&E Package