My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:59 AM
Creation date
9/16/2025 10:02:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 4 of 11 <br />Since the project design development was effectively paused in 2022 Caltrans accepted a PS&E <br />package for review in February 2025, reflective of a revised 95% design level; this was the first time <br />Caltrans had see the project since the 70% submittal in June 2020. Similarly – the City had not seen <br />the project since July 2021. Due in part to this break and also attributed to changes in City and <br />Caltrans staff, procedures, design requirements, project decisions, preferences, goals, and new <br />requirements, a significant number of comments were generated, including many comments and <br />requests for changes. <br />Furthermore, the footprint, direct impacts, indirect impacts, and aforementioned basis of <br />design/assumptions have changed and resulted in a more extensive, complex, and challenging design <br />for this RAB, and sheet coverage to present. Mixed in with the other project requirements, comments, <br />and strategies (including federal funding and involvement with DLA and new Caltrans functional units), <br />the design approval process will require 3 submittals moving forward, beginning at a 100% PS&E <br />Package. <br />• 100% PS&E Package (Task 2) <br />• Final Design PS&E Package (Task 3) <br />• Ready to List(RTL)/Encroachment Permit (EP) PS&E Package (Task 4) <br /> <br />The packages as proposed will also allow Caltrans and City to evaluate the updated and <br />optimized/refined RAB geometry required to address the various project changes including <br />avoidance/minimization to properties, while ensuring design standards and bike, pedestrian and <br />vehicular operations/safety are met and balanced; furthermore – the packages will allow our landscape <br />architect (Gates) to completely update the revised landscaping/irrigation preferences and requirements <br />of the City, and take ownership of the planting/aesthetic vision, plans and specs. <br />This revised PS&E package will focus heavily on resolving, addressing and incorporating Caltrans’ <br />comments, City Comments, and possibly City of Oakland comments (not yet received); the comments, <br />changes, and revisions covered in this 100% PS&E package will be based on the RAB Geometric <br />Design Update completed in Task 1, and include the final optimization and refinement of the geometry <br />as part of this Task 2. <br />The package will also include updated geotechnical and retaining wall design plans/reporting based on <br />the District 4 comments and DES-OSFP comments from the 65% Unchecked structural package <br />submitted in January. The structural and geotechnical package/plans/reports submitted under Task 2 <br />is referred to as a 95% (Checked) Structural Package by DES-OSFP, and will include a separate <br />(independent) submittal/deliverable in parallel with the D4 submittal. <br /> <br />Work in Task 2 includes the following effort/services for the 100% PS&E Package: <br />• Review, Respond, Resolve City/Caltrans Comments on Prior PS&E Package <br />• Finalize Geometric Design Optimizations <br />• Coordinate Remaining/Other Changes with City and Caltrans and Circulate Final Base Sheets to <br />Consultant Team <br />• Prepare Updated Design/Plan Sheets for Revised 100% PS&E <br />• Prepare Updated Specs/Boilerplate for Revised 100% PS&E <br />• Prepare Updated Quantities/Engineers Estimate for Revised 100% PS&E <br />• Prepare Updated Technical Reports for Revised 100% PS&E
The URL can be used to link to this page
Your browser does not support the video tag.