My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:59 AM
Creation date
9/16/2025 10:02:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 5 of 11 <br />• Perform In-House Quality Control Review for 100% PS&E <br />• Incorporate/Address QA/QC Comments and Assemble Revised 100% PS&E Package <br /> <br /> <br />Deliverables: <br />• Response to City, Caltrans and Oakland Comments <br />• 100% Plans, Specifications (Greenbook), and Estimate <br />• 95% (Checked) Structural Package <br />• Draft/Revised Technical Reports, including Traffic Management Plan (TMP), Lane Closure <br />Report/Chart (LCR/LCC), Roadway User Cost (RUC), Storm Water Data Report (SWDR), and <br />Geotechnical (Pavement) Memo, and Drainage Memo. <br />• Draft PEER/EP Application <br /> <br />Task 3 – Final Design PS&E Package <br />For the Final PS&E, BKF will incorporate and resolve any final remaining comments received as a <br />result of the previous submittals, including any remaining City and Caltrans EP comments, in order to <br />produce bid documents which will be ready for approval and advertisement. A final JRT Document and <br />meeting can be scheduled/conducted as needed to resolve all remaining items affecting the <br />construction documents and project schedule; this will include Caltrans, City and Oakland as well (if <br />necessary). <br /> <br />All aspects of the final design are anticipated at this point and will be finalized in order to offer one <br />remaining opportunity for review/comment before preparing the advertised construction documents for <br />signature/approval under Task 4 to support the RFA/E-76 process through DLA. <br /> <br />This package will also allow an opportunity for the remaining comments to be worked out with Caltrans, <br />including coordinating the Structural/Geotechnical 95% package reviewed through DES-OSFP and <br />District 4. The structural and geotechnical package/plans/reports submitted under Task 3 is referred to <br />as a 100% (Checked) Structural Package by DES-OSFP, and will include a separate (independent) <br />submittal in parallel with the D4 submittal. <br /> <br />BKF will conduct a final quality control review on all documents to ensure that all design elements are <br />thoroughly addressed. BKF will package the delivery and submit to the City/Caltrans. <br /> <br />Work in Task 3 includes the following effort/services for the Final Design PS&E Package: <br />• Review, Respond, Resolve City/Caltrans Comments on Revised 100% PS&E Package <br />• Incorporate Comments and Finalize Plans, Specifications, Cost Estimate, and Technical Reports <br />• Final QA/QC Review <br />• Address QA/QC Comments and Assemble Final Design PS&E Package <br />• Prepare Draft PEER and EP Application <br /> <br />Deliverables <br />• Response to City, Caltrans and Oakland Comments <br />• Final Design Plans, Specifications (Greenbook), and Estimate
The URL can be used to link to this page
Your browser does not support the video tag.