Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 6 of 11 <br />• 100% (Checked) Structural Package <br />• Final Technical Reports <br />• Draft-Final PEER/EP Application <br /> <br />Task 4 – Ready to List (RTL)/Encroachment Permit (EP) PS&E Package <br />For the RTL/EP PS&E Package, BKF will finalize any final remaining comments received as a result of <br />the previous submittal, including final remaining City and Caltrans comments, in order to produce bid <br />documents which are ready for approval and release of the encroachment permit necessary to support <br />the RFA/E-76 approval process in order to advertise. <br />This package will also allow an opportunity for the remaining comments to be worked out with Caltrans, <br />including addressing any remaining issues from the Structural/Geotechnical 100% package through <br />DES-OSFP and District 4. <br />A final JRT Document and meeting will be scheduled/conducted as needed to resolve all remaining <br />items affecting the construction documents and project schedule; this will include Caltrans, City and <br />Oakland as well (if necessary). <br /> <br />All aspects of the design will be finalized in order to prepare a complete set of final and constructible <br />bid documents, signed, stamped and ready for advertisement and permitting. BKF will conduct a final <br />quality control review on all documents to ensure that all design elements are thoroughly addressed. <br />BKF will package the signed and stamped documents and project files for delivery to the Caltrans and <br />City. <br /> <br />Work in Task 4 includes the following effort/services for the RTL/EP PS&E Package: <br />• Review, Respond, Resolve City/Caltrans Comments on Final Design PS&E Package <br />• Incorporate Comments and Finalize Plans, Specifications, Cost Estimate, and Technical Reports <br />• Final QA/QC Review <br />• Address QA/QC Comments and Assemble Final EP-Advertise/Bid Documents <br />• Prepare Final PEER and EP Application for Caltrans Approval <br /> <br />Deliverables <br />• Response to City, Caltrans and Oakland Comments <br />• RTL/EP Plans, Specifications, and Estimate, Including Final Structural (Checked) Plans <br />• Approved (Supporting) Technical Reports <br />• Final PEER/EP Application <br /> <br />Task 5 – Project Management and Coordination <br />The project schedule assumes the original PEER/EP Process as summarized in this ASR can be <br />completed within 9 months (March 2026); the addition of the CT NEPA/Federal Funding/RFA-E-76 is <br />estimated to add +3 months to the duration (12 months total, or June 2026). <br /> <br />In order to support the extended project schedule, submittal strategy, and NEPA/Federal Funding <br />Approval process through DLA, BKF will provide Project Management and Coordination services <br />during the course of the design/approval process. The project management hours/fee shown in the <br />attached summary reflect a commensurate level of effort in order to manage and coordinate the scope