My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Group 4 Architecture Reserach + Planning Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Group 4 Architecture Reserach + Planning Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2006 9:22:59 AM
Creation date
11/1/2006 7:41:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/6/2006
Retention
PERM
Document Relationships
Reso 2006-022
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Design Development Documents <br />2.4.1 The Consultant shall develop interior design concepts and meet with PMT and <br />further design development of building systems including structural, mechanical, <br />electrical, lighting design, and finishes. <br />2.4.2 The Consultant shall prepare outline specifications <br />2.4.3 The Consultant shall update the cost estimate <br /> <br />70% Construction Documents <br /> <br />2.4.4 <br /> <br />2.4.5 <br />2.4.6 <br />2.4.7 <br />2.4.8 <br />2.4.9 <br />2.4.10 <br /> <br />Consultant shall distribute DD City-review comments to project team and respond <br />to City-review comments in writing. <br />Consultant shall update project controls. <br />The Consultant shall begin technical specifications. <br />The Consultant shall refine plans, sections. <br />The Consultant shall dev~lop schedule and details. <br />The Consultant shall update cost estimate. <br />The Consultant shall evaluate the design at each project phase to check <br />conformance with the LEED Green Building Rating System. <br />The Consultant shall coordinate consultant work. <br />The Consultant shall conduct document quality control view. <br />The Consultant shall distribute 70% Construction Documents submittal. <br /> <br />2.4.11 <br />2.4.12 <br />2.4.13 <br /> <br />100% Construction Documents <br />2.4.14 The Consultant shall distribute 70% City-review comments to project team and <br />respond to City-review comments in writing. <br />2.4.15 The Consultant shall update project controls. <br />2.4.16 The Consultant shall complete technical specifications. <br />2.4.17 The Consultant shall update interior finishes, schedules, details. <br />2.4.18 The Consultant shall prepare floor plans, equipment, details. <br />2.4.19 The Consultant shall update cost estimate. <br />2.4.20 The Consultant shall evaluate the design at each project phase to check <br />conformance with the LEED Green Building Rating System. <br />2.4.21 The Consultant shall coordinate consultants and conduct a quality control review. <br />2.4.22 The Consultant shall distribute 100% Construction Documents submittal. <br />2.4.23 The Consultant shall conduct one final presentation to the City. <br />2.4.24 The Consultant shall prepare a Construction Document submittal for the Office of <br />Library Construction that meets their submittal requirements. <br /> <br />Final Construction Documents <br />2.4.25 The Consultant shall distribute City-review comments to project team and <br />respond to City-review comments in writing. <br />2.4.26 The Consultant shall update project controls. <br />2.4.27 The Consultant shall revise documents per review comments. <br />2.4.28 The Consultant shall assist the City with the City's responsibilities to obtain <br />approvals from applicable agencies. <br />2.4.29 The Consultant shall submit for plan check review. <br />2.4.30 The Consultant shall revise documents per City plan check comments. <br /> <br />Senior Center <br />Project No. 210-18-116 <br />COBG- Rev. 3/15104 <br /> <br />2/6/06 <br />Page 19 of39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.