My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Brown and Caldwell
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Brown and Caldwell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 4:13:50 PM
Creation date
1/23/2007 4:13:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/2/2006
Retention
PERM
Document Relationships
Reso 2006-112
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Meet with PG&E staff to obtain requirements for replacing PG&E service transformer and <br />transformer feed. <br />Evaluate three wire versus four wire requirements. <br />Develop design standards and criteria for the Project including legend and symbols and <br />construction details. <br />Develop electrical site plan showing modifications <br />Develop preliminary electrical single line diagram. <br />Develop 30 percent plans in conformance with Exhibit A-2 <br />Develop 30 percent design level engineer's opinion of probable construction cost. A <br />construction contingency of 35 percent will be used for this level. <br />Develop 30 percent design submittal including requirements to make electrical system code <br />compliant and catalog cut sheets of equipnlent provided. <br />Assemble outline specification sections. <br />Submit five copies of plans, specifications, and estimate for City review. <br />Attend workshop to discuss City comments to 30 percent design submittal. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Task 3-30 percent Design Submittal- Waste Activated Sludge Thickening Upgrades and <br />Primary Effluent Flow Equalization Improvements. This task includes the following elements: <br />· Visit the site and meet with WPCP staff to gain insight on the Project elements. <br />· Evaluate three waste activated sludge rotary drum thickeners. Manufacturers that will be <br />evaluated include Roediger, FKC, and Huber. The evaluation will include site layout <br />requirelnents and cost. Catalog cut sheets will be provided for each unit. <br />· Detennine flow equalization requirelnents including the following elenlents: 1) flow <br />equalization storage volunle will be detennined by evaluating last five years of data; 2) the <br />affect that the influent pumping station operation has on the flow equalization volume will <br />be evaluated; 3) passive systems (sequentially diverting primary clarifier effluent flow and <br />overflow weirs) and automated systems (nlodulating slide gate, weir plate or control valve) <br />will be evaluated; 4) operation and maintenance requirements including minimizing solids <br />and SCllIn accumulation by increasing the floor slope and automated wash down facilities; <br />and 5) modifications required to convert the Recirculation Pump Station to a Primary <br />Effluent Flow Equalization Return Pumping Station. Catalog cut sheets will be provided for <br />equipment provided <br />· Develop design standards and criteria for the Project. <br />· Develop 30 percent design level engineer's opinion of probable construction cost. A <br />construction contingency of 35 percent will be used for this level. <br />· Develop prelinlinary electrical single line diagram. <br />· Assenlble outline specification sections. <br />· Develop 30 percent plans in confomlance with Exhibit A-2 <br />· Subnlit five copies of plans, specifications, and estimate for City review. <br />· Attend workshop to discuss City conlments to 30 percent design submittal. <br /> <br />Task 4-70 percent Design Submittal- WPCP Electrical Upgrades. This task includes the <br />following elements: <br />· Incorporate City's 30 percent design comlnents. <br />· Develop general and civil drawings. <br /> <br />WPCP Electrical, WAS, Flow EQ Page 16 of 24 <br />593-52-225 <br />
The URL can be used to link to this page
Your browser does not support the video tag.