Laserfiche WebLink
signal modification plans. This would require coordination with utility company for power line relocation. The <br />plans will be prepared using the latest AutoCAD version in City format. Specifications will be prepared in the <br />City's standard format and in accordance with California Department of Transportation (Caltrans) and the <br />Standard Specifications for public works construction 2006 edition "Greenbook" and City of San Leandro <br />Standard Plans. The plans will be prepared at the minimum of 1" = 20', or bigger scale such as 1"=10' may be <br />used when necessary. Preliminary conceptual plans will be submitted to the city for approval. The <br />preliminary plan will include the following: <br />1) Prepare Preliminary 30% Plans, Specifications and Estimate <br />2) Project Review Meeting with the city <br />3) Coordination with Utility Companies <br />Task 4 Preparation of 70% Design and Plans <br />Based on the approval of the 30% design plans and information obtained in Task 2 KOA will prepare a 70% <br />work-in-progress design plans. Similarly as before this will include intersection design and traffic signal <br />design plans. The preliminary plans will include the following: <br />1) 70% Plans, Specifications and Estimate <br />2) Coordination with Utility Companies <br />3) Project Review Meeting with the City <br />Task 5 Preparation of 100% and Final Improvement Plans and Construction Documents <br />KOA will incorporate the comments and prepare 100% construction drawings and documents for the City's <br />final review and comments. Recommend the number of working days to be included in the bid package. <br />Coordination with utility companies will be maintained to make sure their relocation of transmission poles is <br />proceeding according to the proposed schedule. Final 100% Plan submittal will include the following: <br />1) Final Plans, Specifications and Estimate <br />2) Coordination with Utility companies <br />Task 6 Submittal of Stamped Drawings and Specifications and Construction Documents <br />Under this task KOA will finalize the design package, stamped and signed by the KOA project manager and <br />to be incorporated in the bid package for distribution. The 100% submittal will be wet stamped and signed by <br />the engineer in charge. KOA will provide special provisions, engineers estimate and stamped mylars for the <br />final design to the City. This task will include the following: <br />1) Submittal of Stamped Drawings and Specifications and Construction documents <br />Consulting Services Agreement between May 12~, 2008 <br />City of San Leandro and KOA Corporation--Exhibit A Page 16 <br />