My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 TJKM Transportation Consultants
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 TJKM Transportation Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:21:23 PM
Creation date
8/14/2009 12:10:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/21/2003
Retention
PERM
Document Relationships
Reso 2003-105
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Contractor will provide a GPS run plan <br />• Contractor will perform GPS runs for both a.m. and p.m. peak periods <br />• Contractor will complete the reduction of the data <br />• Contractor will derive a speed profile based upon GPS runs <br />Deliverables: GPS Speed Run Plan, GPS speed runs for a.m. and p.m. peak, <br />Speed Profiles for freeway and arterial routes within City. <br />Schedule: 4 weeks after receipt of `Notice to Proceed' <br />Task 3 -Project Based CMA Model <br />• Contractor will set up EMME/2 model for the project <br />• Contractor will define the project area and a study area where the network needs <br />to be revised <br />• Contractor will revise the network to reflect the details (road segments and zones) <br />• Contractor will split the land use data into new zones <br />• Contractor will enter traffic count data for the model calibration <br />• Contractor will revise the travel time functions based on the GPS data for the <br />study area <br />• Contractor will develop intersection delays based on the turning movement <br />volumes and the signal timing data using Synchro <br />• Contractor will calibrate turning movement volumes at 11 intersections in the <br />Project Area <br />• Contractor will calibrate the model based on the observed data <br />• Contractor will review the results <br />• Contractor will prepare a modeling report. <br />Deliverables: Modeling Report and Calibrated Model for City of San Leandro <br />Schedule: 8 weeks after receipt of `Notice to Proceed' <br />Task 4 -Demand Forecasting <br />• Contractor will forecast traffic conditions for year 2010 <br />• Contractor will forecast traffic conditions for year 2030 <br />• Contractor will review the results and modify as required <br />• Reality check for Marina Boulevard Land Use Alternatives as directed by City <br />Deliverables: Forecast of traffic to 2010 and 2030 throughout City of San Leandro <br />(plots), and Assignments for 2005, 2010 and 2025 for Marina Boulevard Land Use <br />Alternatives <br />CSA-TJKM Page 4 of 17 <br />Westgate Extension to Williams Street Project No. 03-144-39-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.