There shall be a maximum of six (6) progress meetings with City throughout the Project <br />duration. <br />Task 1.4 -Monthly Progress Reporting <br />Contractor shall prepare monthly progress reports. For each monthly report, Contractor <br />shall prepare a brief Project status report summarizing the work accomplished, the status <br />of work in progress, an updated project schedule, and any foreseeable problems with <br />meeting the schedule or budget. Progress Reports shall be delivered to the City by the <br />second Tuesday of each month for the duration of the Agreement. <br />Task LS -Design Development <br />Contractor shall supervise and monitor the design development of the Project team <br />throughout the Project. <br />Task 1 Deliverables <br />Project Schedule and Budget <br />Monthly Progress Reports <br />Project meeting minutes <br />Copies of all correspondence with the Project team and all external parties <br />Task 2: Data Research /Preliminary Investigations <br />Contractor shall gather survey data, and collect and review available record drawings of <br />Project Area. Contractor shall provide an aerial base in NAD 83 covering the project <br />limits. <br />Task 21 -Data Collection and Review <br />Contractor shall collect and review available reports, design drawings, and record <br />drawings for the Project. Contractor shall use information from existing reports and <br />drawings, field verifying as required to insure accuracy, in the development of the project <br />geometric alternatives. <br />Task 2.2 -Existing °ght of Way and Access Control Lines <br />Contractor shall establish the existing interchange/roadway right of way and access <br />control lines. Existing right of way shall be inputted into the aerial base to supplement the <br />drawing for clarity and definition. <br />Contractual Services Agreement/BKF Engineers Page 4 of 28 <br />Revised 5-02 <br />