Task 3.4 -Construction Phasing Concepts <br />Contractor shall review the three (3) geometric alternatives for the Westgate Extension <br />connection to Davis Street to determine viable construction staging for each alternative. <br />The Contractor shall identify the phasing concept for each alternative. <br />Task 3 Deliverables <br />Three (3) Alternative Geometric Designs <br />Proposed Right of Way Requirements for Each Alternative <br />Construction Phasing Concept for Each Alternative <br />Task 4: Project Study Report (PSR) Development <br />Contractor shall prepare an Administrative Draft and a Draft Project Study Report (PSR) for the <br />Project. Contractor shall prepare an Initial Study Assessment (ISA) for the project alternative <br />with the maximum environmental impact footprint. <br />Task 4.1-Prepare PSR Narrative <br />Contractor shall prepare the PSR Narrative which follows the most recent guidelines <br />contained in the Caltrans Project Development Procedures Manual. The narrative shall <br />discuss three (3) alternatives as outlined the City Traffic Operations Analysis and a no <br />build alternative. No sub-alternatives will be required. The Contractor shall conduct an <br />environmental assessment to determine the type of environmental document required for <br />the next phase of the project. <br />Contractor shall include the following sections in the narrative for the PSR: <br />Introduction <br />Background <br />Need and Purpose <br />Alternatives <br />System and Regional Planning <br />Environmental Determination and Environmental Issues <br />Right of Way <br />Programming Recommendation <br />District Contact <br />Contractual Services AgreementBKF Engineers Page 6 of 28 <br />Revised 5-02 <br />