My WebLink
|
Help
|
About
|
Sign Out
Home
San Leandro Marina Alts Study_Final
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0321
>
San Leandro Marina Alts Study_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:03:07 AM
Creation date
3/15/2011 1:17:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/21/2011
Retention
PERM
Document Relationships
2A Work Session 2011 0321
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3. Dredaed Materials <br />FIGURE 3-2. Illustration of the Dredged Materials Disposal Concept <br />Dredge material placement strategy to extend Marina life. Each step is only taken if there <br />is no other project requiring fill to create wetlands or for other uses that would either pay <br />for dredging or purchase dredged materials. <br />Place dredge materials within Marina to <br />create wetlands (see three alternatives) in <br />the North Basin. Estimated material <br />89,000 cubic yards (1 dredge cycle over a 4 <br />year period) <br />Place dredge materials to create wetlands <br />and a canoe/kayak water trail within the <br />South Basin. Estimated material 204,000 <br />cubic yards (2 dredge cycles over an 8 year <br />period) <br />Place dredge materials to create permanent <br />seasonal wetland area at the DMMS site. <br />San Leandro Marina Harbor Basin 3-4 ESA / 210461 <br />Alternatives Study March 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.