Laserfiche WebLink
Infrastructure Mitigation Strategies <br />2 of11 <br />E _ -. M z z Responsible Agency <br />b <br />Ordinance or Resolution # (if existing <br />a <br />g or Depart men] <br />program), Estimated Cost and <br />o' o n a a a m .� (Required if Exisling <br />Possible Funding Agency (d high <br />Specific Mitigation Strategy <br />,p n a a m u i � Program. Existing <br />-6 <br />prlorlly). Esllmated Dale or <br />m <br />u w Z _ i5 Q- m Program under <br />_� `m ` Y H <br />'tt <br />Cam pletion (d study), WHY if not <br />�# <br />M �., o a ,� s G funded, Very High, <br />same as regional priority, OR Other <br />W W o 7 7 m ° _ �° ri ij z tj High, or Under Study) <br />Comments <br />a - `T <br />Engage in, support, andlor encourage research by <br />EQ XX <br />City Manager <br />Standard procedure <br />others (such as USGS, universities, or Pacific <br />LS <br />Earthquake Engineering Research Center -PEER) <br />VVF <br />on measures to further strengthen transportation, <br />FL <br />water, sewer, and power systems so that they are <br />less vulnerable to damage in disasters. <br />DR <br />SEC <br />EQ <br />Public Works and <br />B-8 <br />Preposition emergency power generation capacity <br />Critical facilities have been <br />(or have rentelAeasa agreements for these <br />LS <br />Engineering & <br />provided with emergency power <br />generators) in critical buildings ofcities, counties, <br />VVF <br />Transportation <br />equipment or use alternative <br />and special districts to maintain continuity of <br />power. <br />government and services. <br />FL <br />SEC <br />EQ XX <br />Public Works <br />Limited funding has redirected <br />a -9 <br />Ensure that critical intersection traffic lights function <br />fol lowing loss or power by installing battery back- <br />LS <br />priorities at the present time, <br />ups, emergency generators, or lights powered by <br />VVF <br />however this can be considered <br />alternative energy sources such as solar. Proper <br />for future planning. <br />functioning ofthese lights is essential for rapid <br />{=L <br />evacuation, such as with hazmat releases resulting <br />SEC <br />from natural disasters. <br />a -10 <br />Develop unused or new pedestrian rights -of -way as <br />EQ <br />xx <br />Public Works and <br />Limdad bending has redirected <br />walkways to serve as additional evacuation routes <br />LS <br />Engineering & <br />priorities at tha present tim e, <br />(such as fire roads in park lands). <br />VVF <br />Transportation <br />however this can be considered <br />for future planning. Topography <br />FL <br />of the city and the general <br />SEC <br />EQ <br />XX <br />Engineering & <br />urbanized nature ofthe city and <br />Standard procedure <br />a -11 <br />Minimize the likelihood that power interruptions will <br />adversely impact lifeline utility systems or critical <br />LS <br />Transportation when <br />facilities by ensuring that they have adequate back- <br />VVF <br />in conjunction with <br />up Power- <br />Capital Improvement <br />Projects. <br />SEC <br />a -12 <br />Encourage replacing shwa ground electric and <br />EQ <br />En gin awing & <br />Utilities are beind undargi ounded <br />phonewires and other strucWres with underground <br />M <br />LS <br />Transportation <br />as new developments are <br />facilities, and use the planning - approval process to <br />VVF <br />planned as street redesign <br />ensure that all new phone and electrical utility lines <br />projects occur, or as funding is <br />are installed underground. <br />FL <br />available. <br />SEC <br />EQ <br />XX <br />ELIMUD <br />a -13 <br />Ifyou own a dam, coordin ate with the State Division <br />of Safety of Dams to ensure an adequate timeline <br />LS <br />for the maintenance and inspection of dams, as <br />VVF <br />required of dam owners by State law, and <br />commu ni cate this information to local governments <br />FL <br />and the pu blic. <br />SEC <br />2 of11 <br />