My WebLink
|
Help
|
About
|
Sign Out
Home
3C Public Hearing 2011 1219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1219
>
3C Public Hearing 2011 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2011 9:36:10 AM
Creation date
12/13/2011 5:58:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/19/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1219
Reso 2011-207
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Infrastructure Mitigation Strategies <br />4 of11 <br />E _ -. M U z Res Agency <br />Ordinance or Resolution 4 (if existing <br />a <br />o a or Depart ment <br />program), Estimated Cost and <br />m n a ,3 a m .� (Requ if Exisling <br />Possible Funding Agency (d high <br />Specific Mitigation Strategy <br />vI m a -o b ¢ ,p Q @ Program. Existing <br />priorlly). Esllmated Dale or <br />v a w Z _ rn Q- m Program under <br />`m <br />Core pletion (d study), WHY if not <br />N Zy �., o a ,� s v Y H funded, Very High, <br />some as regional priority, OR Other <br />o <br />❑� <br />`; 2 W W o 7 7 m € o = �° J_ z , U z U High, or Under Study) <br />Comments <br />a - 20 <br />Establish plans for delivery of fuel to critical <br />EQ <br />yX <br />Finance <br />Working with consortium of cities <br />infrastructure providers. <br />LS <br />to establish fuel cooperative. <br />VVF <br />FL <br />SEC <br />a -21 <br />As an infrastructure operator, designate a back -up <br />EQ <br />)(X <br />City Man agar <br />Police building has hem <br />Emergency Operations Center with redundant <br />LS <br />designated the back -up EOC <br />communications systems. <br />INF <br />FL <br />SEC <br />EQ <br />Public Works and <br />Will be considered for future <br />a -22 <br />Monitor scientific studies of the Sacramento-San <br />Joaquin Delta and policy decisions related to the <br />FL <br />Engineering £, <br />planning. <br />long -term disaster resistance ofthat Delta system <br />Transportation <br />to ensure that decisions are made based on <br />comprehensive analysis and in a scientifically - <br />defensible manner. Levee failure due to <br />earthquakes, flooding, and climate change <br />(including see level rise and more frequent and <br />more severe Flooding) are all of concern . The long <br />term health of the Delta area is critical to the Bay <br />Area's water supply, is essential for the San <br />Francisco Bay and estuary's environmental health, <br />provides recreation opportunities for Bay Area <br />residents, and provides the long -term sustainability <br />of Delta communities. Mile only part ofthe Delta is <br />within the nine Bay Area counties covered by this <br />multi-jurisdictional LHM P, the Delta is tied to the <br />infrastructure, water supply, and economy of the <br />Bay Area. <br />EQ <br />XX <br />INFR - <br />In - Earthquakes <br />b-f <br />Expedite the Funding and retrofit ofseismicalty- <br />Engineering $ <br />Replacement underway for two <br />deficient city- and county -owned bridges and road <br />Transportation <br />majorovercrossings <br />structures by working with Caltrans and other <br />appropriate overnmental agencies. <br />b-2 <br />Establish a higher priority for funding seismic retrofit <br />EQ <br />XX <br />Transit agencies <br />of existing transportation and infrastructure systems <br />(such as BART) than for expansion ofthose <br />system s- <br />EQ XX <br />b-3 <br />Include "areas subject to high ground shaking, <br />Engineering and <br />Standard procedure <br />earthquake-induced ground failure, and surface <br />Transportation <br />fault rupture" in the list of criteria used for <br />determining a replacement schedule for pipelines <br />(along with importance, age, type of construction <br />material, size, condition, and maintenance or repair <br />history). <br />4 of11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.