Laserfiche WebLink
C ITY OF S AN L EANDRO <br />S AN L EANDRO S HORELINE D EVELOPMENT P ROJECT EIR <br />EXHIBIT A: WORK SCOPE AND COSTS <br /> <br />THE PLANNING CENTER | DC&E 10 <br />MAY 1, 2013 <br /> <br />11. TECHNICAL R EPORT <br />KAI will document the transportation analysis from tasks 1 through 10 in a stand-alone <br />technical report. <br /> <br />12. INPUTS FOR AIR AND NOISE ANALYSES <br />KAI will provide traffic output data for the Air and Noise analyses, including: <br /> <br />♦ Daily Volumes for all roadways segments that are counted for all scenarios (preferably <br />in an excel file) <br /> Existing with and without project <br /> Buildout with and without project <br />♦ Fleet mix on the segments for existing and future timeframes, if available <br />♦ Speed limits on the segments for existing and future timeframes, if available <br />♦ Weekday and Weekend (if available) Trip Generation for land uses for all scenarios <br /> Existing trip generation <br /> Buildout (trip generation by land use type and indicate assumptions for reductions <br />for passby/diverted/internal trip capture) <br /> <br />13. A DMINISTRATIVE DRAFT EIRS <br />KAI will assist The Planning Center | DC&E with development of the Traffic section and <br />respond to two rounds of comments on the ADEIR. <br /> <br />14. DRAFT EIR <br />KAI will assist The Planning Center | DC&E with development of the Traffic section and <br />respond to one round of public comments on the Draft EIR. <br /> <br />15. MEETINGS <br />KAI will attend up to six meetings with the City of San Leandro staff, Caltrans staff, or other <br />relevant agencies staff, and two public hearings as part of this scope of work. Some of the <br />project meetings will occur via conference call. City Planning commission, City Council and <br />Public Hearings will be at the City. <br />