My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2013-159
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2013
>
Reso 2013-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2014 2:26:30 PM
Creation date
1/2/2014 4:22:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/16/2013
Retention
PERM
Document Relationships
10C Action 2013 1216
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1216
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gyp; Lit San Lean dro <br /> t q <br /> yU <br /> 'jo <br /> \0000,0 <br /> N�unrywmu�4 i, <br /> iu� ^aY <br /> o- <br /> ;t <br /> i <br /> c +ruuum + <br /> H 1„1 Q <br /> I_ <br /> Accomplishments To-Date: In October 2012, the requested grant was awarded. The grant is a <br /> matching grant, with the EDA contributing up to 50% of the cost of the project. The entire <br /> project cost is estimated to total $4.3 (rounded). The City's contribution includes the value of <br /> the land (street rights of way), architectural and engineering services and some absorption of <br /> cash expenses. <br /> • Appraisal was completed in April 2013. <br /> • Site survey contract approved by City Council on May 20tH <br /> Construction is anticipated to begin in early 2014. <br /> Regional Expansion — It is Dr. Patrick Kennedy's intention to expand Dark Fiber LLC <br /> throughout the Bay Area Region. While staff is not directly involved with those discussions, we <br /> recognize that the San Leandro and the East Bay has a brief window in time before high speed <br /> internet is universally available. Accordingly, San Leandro is in a unique leadership position to <br /> demonstrate how to use high-speed internet access to drive economic, social and cultural <br /> growth. As other cities are added to the SL Dark Fiber network, it will be important for us to <br /> alt of Leandro Economic icD°evelo Development and Wori"< Plan December 2013 <br /> Y � p Strategy � <br />
The URL can be used to link to this page
Your browser does not support the video tag.