My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2014 0121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0121
>
8B Consent 2014 0121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:05:58 AM
Creation date
1/15/2014 6:03:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/21/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0121 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0121
Reso 2014-005
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-328 <br />The total cost of the construction phase of the WPCP Rehabilitation project, including off haul <br />of the soil described herein is $53,500,000. <br />Current appropriations are as follows: <br />• $43,000,000 of State Revolving funds in account 593-52-251 <br />$7,850,000 of Water Pollution Control Plant Enterprise funds in accounts 593-52- <br />250 and 593-52-252 <br />An additional appropriation of $2,650,000 in Water Pollution Control Plant Enterprise Funds is <br />requested and will be authorized by the attached resolution, if approved. <br />Approval of this request will leave the Water Pollution Control Plant Enterprise Fund with a <br />cash fund balance of approximately $17,800,000 based on the June 30, 2013 audited <br />financials. The currently planned sewer fee rates will be sufficient to maintain an adequate <br />fund balance. <br />Budget Authority <br />Existing appropriations were authorized by Council resolutions that were passed on July 5, <br />2011. <br />PREPARED BY: Nick Thom, Senior Engineer, Engineering and Transportation Department <br />City of San Leandro Page 3 Printed on 1114/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.