My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Raimi+Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Raimi+Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 9:22:38 AM
Creation date
6/5/2015 4:58:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
Agmt 2017 Amend No. 1 Raimi+Associates
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2015-098
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> • Parking facilities <br /> • Existing traffic data <br /> • Intersection level of service <br /> • Safety data, including SWITRS and the City's Collision data <br /> The analysis will build off prior studies, including the BART Station Access Study (2006) and the Station <br /> Area Improvement Plan (2009). Additionally, KAI is currently working with the City on its General Plan <br /> update and will utilize background data from that effort as part of the PDA Report transportation section. <br /> Specific examples of data sharing between the two studies are as follows: <br /> • Data regarding planned transportation improvements will be collected through the General Plan <br /> update and will be utilized for this effort. <br /> • Traffic data collection efforts will be coordinated with the data compilation for the General Plan <br /> update currently underway. For this study it is assumed that ten (10) intersections and/or driveway <br /> locations will be included in the analysis beyond what is included for the General Plan and EIR. The <br /> intersection analyses will be completed for current conditions. <br /> • Roadway segment traffic counts are being assembled as part of the General Plan and will be used <br /> for this effort. No additional roadway segment data collection is assumed as part of this study. <br /> • As part of the General Plan update currently underway, KAI is evaluating collision history data using <br /> SWITRS reports and the City's Citywide Collision Database. The results of this effort (i.e., specific <br /> intersections or roadway segments that have experienced more collisions than would be expected) <br /> will be used to identify safety problem areas within the Bay Fair study area. <br /> • Existing BART and AC Transit service coverage, frequency and ridership will be collected through the <br /> General Plan and used for this effort. <br /> This data will be supplemented through additional data collection specific to the station area, including BART <br /> parking supply and utilization, as well as time-of-day transit ridership data for BART and AC Transit. This will <br /> allow for an in-depth understanding of existing travel patterns and transit demand. <br /> KAI will prepare the transportation section with accompanying tables and graphics to summarize existing <br /> transportation conditions and key issues within the study area. For budgeting purposes, one (1) round of <br /> revisions is assumed. <br /> Task 1.5: Infrastructure Memo. Wood Rodgers will prepare a base map/database of existing infrastructure Infrastructure Memo September 2015 <br /> within and adjacent to the Specific Plan project site using available information. The existing Alameda County <br /> GIS database (which includes base maps, parcels, flood control & drainage facilities, existing FEMA <br /> RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 I PAGE A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.