Laserfiche WebLink
EXHIBIT A <br /> Task 3.2.4: Infrastructure Development and Budget. Wood Rodgers will use the data compiled in Infrastructure Development September 2016 <br /> Task 1.5 and large-scale, planning-level calculations to develop an assessment of the capacity of and Budget Memo <br /> the existing major infrastructure to serve the existing land use. The infrastructure assessment will <br /> include drainage, water, sewer, and dry utilities. Necessary flood control improvements will be <br /> based on existing information available from Alameda County. <br /> The same planning-level methodology will then be used to provide an assessment and identify <br /> specific deficiencies of the existing major infrastructure for the purpose of serving the selected <br /> land use alternative in the Specific Plan. Significant deficiencies will be identified, then planning- <br /> level design of the improvements necessary to serve the proposed land use will be developed. <br /> The transportation memo developed in Task 1.4 and the results of the Access and Connectivity <br /> Plan developed in Task 3.2.1 will be used to identify major street and roadway improvements <br /> required for the selected Specific Plan alternative. The proposed improvements will reflect the <br /> City's Climate Action Plan. <br /> The need for schools, libraries, and parks will be determined based on the selected Specific Plan <br /> Alternative. <br /> These preliminary designs will then be used to develop planning-level cost estimates for the TOD <br /> Specific Plan alternative. The unit costs will be based on available local construction bids, and <br /> quantities will be based on the planning-level design. <br /> Task 3.2.5: Implementation Plan and Financing Strategy. Working with R+A, VMWP and City Implementation Plan and October 2016 <br /> staff, SE will prepare a strategy identifying actions to implement the TOD Specific Plan vision and Financing Strategy <br /> goals. This strategy will describe phasing of capital investments and programmatic actions, and <br /> will break out capital costs into increments that correspond to potential funding/financing sources. <br /> VMWP and R+A will work together to identify physical improvements needed, along with <br /> infrastructure improvements identified in Task 3.2.4. The strategy will be tailored to attract transit- <br /> oriented development, remove development constraints, and accommodate availability of funding <br /> sources. The final product for this implementation strategy will include two parts. The first part will <br /> be a narrative explanation of the costs by item or action, the timing/phasing of the investments <br /> based on likely market timing, and an explanation of all funding/financing sources that could be <br /> deployed to meet the costs for each item. The second part will be a summary matrix showing this <br /> RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 I PAGE A-13 <br />