Laserfiche WebLink
EXHIBIT A <br /> Task 4.1 CEQA Review. Rincon Consultants will be responsible for preparing and completing the Data review, project June 2015-March <br /> environmental impact report (EIR) to ensure consistency between the Specific Plan and CEQA. description and existing 2017 <br /> For cost-savings and efficiency purpose, Rincon will make use of existing environmental conditions inventory <br /> documentation (e.g., technical studies, City and regional plans, policies and technical reports, <br /> recent CEQA documents prepared for other projects and programs in the area, including the <br /> General Plan Update EIR, if available). Notice of Preparation (draft <br /> and final) <br /> The EIR work program will include the following key tasks: <br /> • Data review and preparation of existing conditions. This task will include compiling data <br /> sources and identifying and describing existing environmental conditions. These <br /> investigations will inform the scoping discussions and form the basis of the Environmental Notice of Completion (draft <br /> Settings chapters of the EIR. and final) <br /> • Define the project. The project description will summarize the Specific Plan and <br /> associated actions, focusing in detail on aspects that would affect the physical Administrative Draft and <br /> environment. Textual, tabular, and graphic presentation will be included as necessary to Red-line Draft <br /> facilitate a thorough understanding of the proposed plan and its potential implementation. <br /> • Assess EIR Scoping Topics with City staff. Rincon will coordinate with City staff to obtain Draft EIR <br /> initial guidance and information to kick-off the scoping analysis and process. Based on <br /> the scope of the project and the existing site conditions, it is anticipated that the EIR will Notice of Determination (draft <br /> need to address nearly all of the topics on the CEQA Guidelines Appendix G Checklist. and final) <br /> This will be confirmed through preparation of the Initial Study. <br /> • Initial Study. Rincon will prepare an Initial Study using the City's environmental checklist Final EIR <br /> and will address each checklist item, supporting all conclusions with reasoned analysis, <br /> quantified where appropriate. <br /> • Notice of Preparation and Scoping meeting. Upon City approval of the Initial Study, <br /> Rincon will prepare a Notice of Preparation for City review. The Notice, along with the <br /> draft Initial Study if desired, will be circulated for the required 30-day review period. <br /> Rincon will assist with development of a distribution list and program and will be <br /> responsible for distribution to the County Clerk and State Clearinghouse. During the 30- <br /> day NOP review period, Rincon will design and lead an EIR Scoping Meeting as part of a <br /> Planning Commission meeting. Rincon will provide written and visual materials, including <br /> staff report, meeting agendas, sign-in sheets, comment sheets, and a PowerPoint <br /> presentation. <br /> • Administrative Draft EIR. Each environmental issue addressed in the EIR will have four <br /> RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 PAGE A-15 <br />