Laserfiche WebLink
<br />Consulting Services Agreement between June 5, 2015 <br />City of San Leandro and Harris Design—Exhibit B Page 17 of 23 <br />5.10 Final Review <br />Not included. City staff will inspect the site at the end of the project maintenance period. <br /> <br />5.11 Review Contractor-Supplied Verifications and Supplemental Information <br />Receive and review maintenance and operating instructions, schedules, irrigation controller charts, and <br />guarantees, which are to be assembled by the Contractor in accordance with the Construction Contract <br />Documents. Such review will only be to determine that their content complies with the requirements of the <br />Construction Contract Documents. <br /> <br />5.12 Record Drawings <br />Record drawings are not part of the scope of work, since they will be provided by the Contractor. <br /> <br />5.13 Project Close-Out <br />Close out and archive Consultant’s project files and records.