My WebLink
|
Help
|
About
|
Sign Out
Home
10B Action Items 2017 0703
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0703
>
10B Action Items 2017 0703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 7:07:15 PM
Creation date
6/27/2017 7:07:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/3/2017
Retention
PERM
Document Relationships
Agmt 2017 Amend No. 1 to Indigo/Hammond & Playle Architects, LLP Project No. 2014.0481
(Reference)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2017-093
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Amendment No. 1 to <br />Consulting Services Agreement between City of San Leandro and 4/4/2017 <br />Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Page 7 of 10 <br /> <br /> Minor modification to building mechanical and electrical building systems for the remodel area shall <br />be included, however significant mechanical or electrical renovations to building central systems is <br />not included. <br /> Emergency generator and power system replacement is excluded. <br /> Preparation of CAD backgrounds for area of work based on as-built drawings provided by City and <br />limited field reconnaissance is included, however extensive field measuring to document existing <br />conditions is not included. <br /> Agency or utility permitting plan check or review fees (to be paid by City) <br /> Value engineering or constructability reviews conducted outside of A&E (architect & engineer) <br />team. <br /> Design of a project substantially exceeding the construction cost budget of $5,436,000 or <br />substantially exceeding timeline stated above. <br /> Printing and delivery will be charged as reimbursable expenses and are in addition to the basic <br />scope fee amounts. <br />58
The URL can be used to link to this page
Your browser does not support the video tag.